Operation
8–16
976-0043-01-02
01B EQ Charge OFF ON
OFF
When OFF is selected in the menu, the inverter is not set to
equalize the batteries.
ON
This selection triggers the battery charger to initiate the
equalization process. If the AC source is present on the AC1 grid or AC2
GEN terminals, the equalization process will begin. The cursor
automatically returns to OFF after the EQ cycle is finished.
If the only AC source is connected to the AC2 GEN terminal (generator
input) but not present (that is, waiting for the generator to start), the
generator will start the equalization process the next time the generator is
started. After the EQ cycle has finished, the generator is stopped, after
cooldown if started automatically, and the cursor returns to OFF.
A BULK charge can be initiated by moving the cursor to ON, then OFF.
01C Search Watts (SRCH)
This menu item sets the inverter’s search sensitivity. Any load that is
below this setting does not cause the inverter to produce an AC output
voltage when running from batteries. The SRCH function must be
selected in 01A Inverter.
Setting this mode to 00 disables this function.
The default setting for this menu item is 8 watts.
See
“11E Search Watts” on page 6–14
for additional information about
how this feature works and how to determine the value for this setting.
01B EQ Charge
OFF ON
01C Search Watts
(SRCH)
Note:
This item is duplicated for your convenience in menu item 01C and
11E. Changes to settings made at 01C will also change the setting in 11E.
Содержание SW Plus 2524
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 02 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Страница 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Страница 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Страница 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Страница 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Страница 200: ...Advanced Setup 7 22 976 0043 01 02 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 250: ...8 32...
Страница 274: ...A 16...
Страница 308: ...C 18...
Страница 312: ...D 4...
Страница 316: ...E 4...
Страница 338: ...I 6...
Страница 342: ...Index IX 4 976 0043 01 02...
Страница 343: ......