Battery Configurations
976-0043-01-02
C–9
Battery Configurations
The battery bank must be wired to match the inverter’s DC input voltage
specifications (24 or 48 Vdc). In addition, the batteries can be wired to
provide additional run time. The various wiring configurations are:
Series
Wiring batteries in series increases the total bank output voltage. This
voltage MUST match the DC requirements of the inverter or inverter and/
or battery damage may occur.
Parallel
Wiring the batteries in parallel increases the total run time the batteries
can operate the AC loads. The more batteries connected in parallel the
longer the loads can be powered from the inverter.
Series-Parallel
Series-parallel configurations increase both the battery voltage (to match
the inverter’s DC requirements) and run-time for operating the AC loads.
This voltage must match the DC requirements of the inverter.
Batteries with more than two or three series strings in parallel often
exhibit poor performance characteristics and shortened life.
Wiring Batteries in Series
Effect
Wiring the batteries in a series configuration increases the voltage of the
battery string. Six-volt batteries can be combined to form 24-volt or 48-
volt battery banks. In the same way, 12-volt batteries connected in series
form 24-volt and 48-volt battery banks. The total current capacity of the
bank does not increase and remains the same amp-hour rating as it does
for a single battery.
Important
The voltage must match the DC requirements of the inverter.
Figure C-1
6-volt Battery Wiring - “Series” Configuration
+
-
+
-
6 V
6 V
+
-
24 V INVERTER
(Total battery capacity = 100 Ah)
+
-
+
6 V
6 V
-
+
-
+
-
6 V
6 V
+
-
48 V INVERTER
(Total battery capacity = 100 Ah)
+
-
+
-
6 V
6 V
+
-
+
-
6 V
6 V
+
-
+
-
6 V
6 V
Each battery’s amp-hour rating is 100 Ah.
Содержание SW Plus 2524
Страница 2: ......
Страница 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Страница 82: ...2 48...
Страница 101: ...DC Wiring 976 0043 01 02 3 19 Figure 3 9 BTS RJ11 Port Location and Installation BTS RJ11 Port DC End of the Inverter...
Страница 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Страница 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Страница 126: ...3 44...
Страница 127: ...4 Functional Test Chapter 4 Functional Test explains how to conduct a functional test of the inverter...
Страница 132: ...4 6...
Страница 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Страница 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Страница 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Страница 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Страница 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Страница 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Страница 200: ...Advanced Setup 7 22 976 0043 01 02 Figure 7 3 Relay 11 Wiring Example to Dual Inverters with Cooldown selected...
Страница 250: ...8 32...
Страница 274: ...A 16...
Страница 308: ...C 18...
Страница 312: ...D 4...
Страница 316: ...E 4...
Страница 338: ...I 6...
Страница 342: ...Index IX 4 976 0043 01 02...
Страница 343: ......