NOx-N
Maintenance
3 - 15
ba43110e05
01/2011
Operating sequences
The operating sequences of the service routines,
Displace pump
tubings
and
Replace pump tubings
, are identical:
Duration
z
Part 1: approx. 1
½
minutes
z
Part 2: approx. 1
½
minutes
Note
You can display the intervals and leave the menu or start a sequence
of operations. You can then no longer quit this procedure. If the tubings
have been replaced or displaced, an AutoCal procedure is triggered
when the measuring procedure is started.
Step
Instrument status/action
1
Flush back sample
Displace/replace tubing. During this operation, the TresCon NOx-N
remains in the Wait mode. After confirmation of the tasks by pressing
a key, the sequence of operations is continued.
2
Rinse sample
Part 1
Emptying the system
Part 2
Filling the system
Содержание TresCon NOx-N
Страница 20: ...Overview NOx N 1 16 ba43110e05 01 2011 ...
Страница 92: ...Maintenance NOx N 3 44 ba43110e05 01 2011 ...
Страница 98: ...What to do if NOx N 4 6 ba43110e05 01 2011 ...
Страница 108: ...Appendix NOx N 6 8 ba43110e05 01 2011 ...
Страница 111: ......