Service Manual
Repair Procedures
73
6.
Lift out the Recharger board.
When installing the Recharger board:
•
blow out any dust and particulates using pressurized de-ionized gas
•
move all cables out of the way
•
torque screws to 3.8in-lbs to 4.2in-lbs (.43N-m to .47N-m)
Caution
As you set the board in place during installation, keep the board clear
of the power switch solder terminals to avoid binding against them. The
terminals may become damaged if force is applied against them.
0696 40
Screws
Screws
Содержание Propaq Encore
Страница 1: ...Propaq Encore Vital Signs Monitor Service Manual...
Страница 14: ...10 Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 50: ...46 Troubleshooting Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 96: ...92 Repair Procedures Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 111: ...Service Manual Technical Overview 107 Cabling Diagrams cabling diag...
Страница 120: ...116 Technical Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 126: ...122 Field Replaceable Units FRUs Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 128: ...124 Manufacturable Test Equipment Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 130: ...126 Dynatech Nevada Patient Simulator Modification Welch Allyn Propaq Encore Vital Signs Monitor...