December 5, 2017, 715004753 Rev. B
Page 28
Ensure that the instrument serial number on the rear panel nameplate or inside the front door
corresponds to the number on the instrument validation certificate.
2.3
Selecting a laboratory site
To ensure the detector’s reliable operation, observe these precautions:
•
Do not situate it under a heating or cooling vent.
•
Connect it to a power supply that is grounded AC, 100 to 240 Vac.
•
Provide clearance of at least 12.7 cm (5 inches) at the rear, for ventilation
Place the detector close to the outlet of the column, to minimize band broadening, which reduces
the resolution of the chromatogram.
Requirement:
Mount the detector on a level surface, to allow proper function of the drip
management system (drain tube), to which you can connect a waste reservoir that diverts solvent
leaks from the flow cell.
2.4
Stacking system modules
This procedure applies to system modules that are equipped with interlocking features.
To stack the modules:
1.
Place the rear feet of the module that you are adding atop the previously added module in
the system stack, and slide the new module backward until its rear alignment pin rests in the
rear alignment slot on the previously added module.
Notice:
To avoid damaging the detector, the weight of items stacked on top of it must not
exceed 18.1 kg (40 pounds).
Warning:
To avoid spinal and muscular injury, do not attempt to lift a system module
without assistance.
Warning:
To avoid crushing your fingers beneath or between modules, use extreme care
when installing a module in the system stack.
Содержание 2998
Страница 2: ...December 5 2017 715004753 Rev B Page ii...
Страница 8: ...December 5 2017 715004753 Rev B Page viii...
Страница 14: ...December 5 2017 715004753 Rev B Page xiv...
Страница 26: ...December 5 2017 715004753 Rev B Page 26...
Страница 44: ...December 5 2017 715004753 Rev B Page 44...
Страница 60: ...December 5 2017 715004753 Rev B Page 60...
Страница 68: ...December 5 2017 715004753 Rev B Page 68...