WP1624 Series
Firewood Processor
Pre-Start Checklist
45
Grasp the chain at the midpoint of the guide bar and pull the saw
chain away from the bar rails. The drive link tangs should nearly
come out of the bar groove.
00389
Fig. 43 –
Check Saw Chain Tension
•
Inspect for broken, cracked, damaged, or missing saw
chain components. Inspect loose rivets. If rivet can be
turned by hand, it is too loose.
•
Inspect for excessive stretch. Stretch is wear occurring to
the flange of the rivet and the holes in drive links.
•
Inspect the chain chassis for abnormal wear patterns,
which are indicators of other cutting system issues with the
guide bar and drive sprocket.
Refer to the
Oregon® Mechanical Timber
Handbook
for additional information on the
saw chain and bar. A copy of this manual can
be found on the Wallenstein website under
Technical Reference.
8.7 Machine Break-In
Although there are no operational restrictions on the firewood
processor when used for the first time, it is recommended that
the following mechanical items be checked:
For new saw chain, check tension often during the first 10
minutes of use.
Consider transporting new and newly sharpened saw chain to
and from the job site in a container with lubricant.
1.
Lubricate your saw chain prior to use.
2.
Increase saw speed gradually over the first 2–4 minutes
of running time while cycling the guide bar, until bar oil is
observed coming off the tip.
3.
Check saw chain tension. Adjust if necessary.
After 1–5 hours of operation:
4.
Check all nuts, bolts, and other fasteners. Tighten to their
specified torque.
5.
Check hydraulic system for leaks. Tighten all leaking fittings
and replace any leaking components.
6.
Check machine fluid levels: Fuel, engine oil, and hydraulic
oil reservoir. Top up as required.
7.
Check for entangled material. Remove all entangled material
before resuming work.
After 20 hours of operation:
8.
Repeat Steps 4 through 7 listed above.
9.
Check and adjust the tension on all drive chains. Chains
may stretch slightly as they wear in. See page
10.
Go to the normal servicing and maintenance schedule as
defined in the Maintenance Section. See page
.
After 50 hours of operation:
•
Adjust the infeed conveyor chain tension. See page
•
Adjust the Live Deck chain tension. See page
•
Adjust the 12 foot integrated conveyor chain tension (if
equipped). See page
•
Adjust the 24 foot self-contained hydraulic conveyor chain
tension (if equipped). See page
Содержание P3 PULSE WP1624
Страница 18: ...WP1624 Series Firewood Processor Safety 18 Safety Signs 0 4 3 9 10 5 14 8 13 15 Fig 4 Safety Decal Locations...
Страница 62: ...Service and Maintenance WP1624 Series Firewood Processor 62 1 2 4 5 6 3 Fig 76 Lubrication Diagram...
Страница 87: ......
Страница 88: ...WallensteinEquipment com...