27
VM 5000
OPERATING MANUAL
EDITION 07/2014
ORDER NUMBER DOC 2344501
The following points should be noted before commissioning:
Lay grounding cable from the grounding screw on the device to the signal ground
and ensure that all other conductive parts within the working area are grounded.
Connect the VM 5000 electrostatic control unit via the mains cable to the socket
interlocked with the extraction system.
Connect the gun cable to the connector socket and screw into place.
Connect the gun to the adjustable, clean air supply.
Compressed air quality class 3.5.2 according to ISO 8573.1.
Connect the GM 5000EA or GM 5000EAC to the paint supply as described in the
relevant operating manuals.
Check that all product-conveying connections are correctly connected
Check that all air-conveying connections are correctly connected.
Visually check the permissible pressures for all the system components.
Check the level of the separating agent in the pump and fi ll up if necessary.
Provide product tank, tanks for fl ushing agent and an empty tank for return fl ow.
The interface on the rear of the control unit must be protected with a cover.
Connect the system to the air supply.
During fi rst commissioning of the system -> fl ush the system in accordance with the
data given in the operating manuals for the other components.