background image

1

USERS INSTRUCTIONS

1.1 GAS APPLIANCES

Gas Safety (Installation and Use) Regulation (UK).

In the interests of your safety and that of others it is a legal 

requirement that all gas appliances are installed and correctly 

maintained by a competent person and in accordance with the 

latest regulations.

1.2 ELECTRICAL SUPPLY

Please ensure that this appliance has been properly connected 

to the electrical supply by means of a double pole isolator or 

un-switched socket, and that the correct size of fuse (3 AMP) 

has been 

fi

 tted.

Warning: this appliance must be earthed!

  

1.3 GUARANTEE REGISTRATION CARD

Please take the time to 

fi

 ll out your guarantee registration card. 

The completed warranty card should be posted within 30 days 

of installation.

1.4 APPLIANCE COMMISSIONING CHECKLIST 

(UK only)

A checklist section can be found at the rear of the appliance 

installation booklet. This important document must be com-

pleted during the installation/commissioning of your boiler. All 

GAS SAFE registered installers carry a GAS SAFE ID card, 

and have a registration number. These details should be re-

corded in the Benchmark commissioning checklist section 

within the installation booklet. You can check your installers 

details by calling GAS SAFE direct on 08004085500. Failure 

to install and commission the appliance in accordance with 

the manufacturers instructions will invalidate the warranty. 

This does not affect your statutory rights.

1.5 HOW DOES IT WORK?

Your 

Unica

 

boiler supplies heated water to your radiators and 

hot water to your hot water taps. The central heating is con-

trolled via a time clock and any thermostats that your installer 

may have 

fi

 tted.  The boiler will light when it receives a request 

from the time clock via any thermostat that may be installed, or 

whenever a hot water outlet (tap) is opened. Your 

Unica

 

 boiler 

lights electronically and does not have a pilot light.

In the unlikely event of a fault developing with your boiler, the 

supply of gas to the burner will be terminated automatically.

Dear Customer

Your Vokèra 

Unica

 

 boiler has been designed to meet and exceed the very latest standards in gas central heating technology, 

and if cared for, will give years of reliable use and ef

fi

 ciency.  

Please therefore take some time to read these instructions carefully.

Do’s and Don’t’s

Do

 ensure that the system pressure is periodically checked

Do

 ensure that the boiler should not be used by children or unassisted disabled people

Do

 ensure that you know how to isolate the appliance in an emergency

Do

 ensure that you are familiar with the appliance controls

Do

 ensure that your installer has completed the appliance log book section

Do not

 attempt to remove the appliance casing or gain internal access

Do not

 hang clothes etc. over the appliance

Do not

 forget to have the appliance serviced annually.

This booklet is an integral part of the appliance. It is therefore necessary to ensure that the booklet is handed to the person re-

sponsible for the property in which the appliance is located/installed. A replacement copy can be obtained from Vokèra customer 

services.

INTRODUCTION

1.6 DIMENSIONS

1.7 CLEARANCES REQUIRED

1.8 FROST PROTECTION SYSTEM

The 

Unica

 

is equipped with a built-in frost protection system, 

this enables the boiler to over-ride the time controls – even if 

switched off – and operate the burner and/or pump, should 

the temperature drop below 5

0

C for the main and for the DHW 

line. In particular the burner will be in ON status until the main 

temperature reaches 35°C for CH appliance and 55°C for 

DHW appliance.

 

Please note that the frost protection system 

is designed to protect the appliance only, should frost protec-

tion be required for the heating system, additional controls 

may be required.

NOTE

The frost protection system is reliant on the appliance having a 

permanent electrical supply, and being in a non-fault condition.

1.9 APPLIANCE STATUS INDICATORS

Your boiler is equipped with a large LCD display that indicates 

the appliance operating status. 

1. THINGS YOU SHOULD KNOW

  

Unica i28

Unica i32

Unica i36

HEIGHT

780 mm

780 mm

780 mm

WIDTH

400 mm

400 mm

400 mm

DEPTH

358 mm

358 mm

384 mm

ABOVE

150 mm

BELOW

150 mm

LEFT SIDE

12 mm

RIGHT SIDE 12 mm
FRONT

600 mm

Содержание Unica i28

Страница 1: ...d member of the Benchmark scheme which aims to improve the standards of installation and which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK c...

Страница 2: ...circulation 12 3A 7 Electrical supply 12 3A 8 Mounting on a combustible surface 12 3A 9 Timber framed buildings 12 3A 10 Inhibitors 12 3A 11 Showers 12 3A 12 Declaration of conformity 12 Installation...

Страница 3: ...ally Dear Customer Your Vok ra Unica boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and effici...

Страница 4: ...nk bullet points The display shows the temperature values Pressure gauge shows the current pressure of your heating system the gauge should be set between 1 and 1 5 BAR When the appliance is oper atin...

Страница 5: ...when frost protection function is ac tive Displayed when hot water pre heat function is enabled Flashes when functioning Displayed if an alarm or fault has been detected Displayed when low system pres...

Страница 6: ...wo minutes before re setting the appliance 2 6 EXPLANATION OF FEATURES Although the Vok ra Unica has been designed for simplicity of use it utilises the latest in boiler technology enabling a host of...

Страница 7: ...ustomerServices 08443910999 UK or 056 7755057 ROI have all your details to hand including full address and postcode relevant contact numbers and your completed appliance log book ALARM CODE CAUSE ACTI...

Страница 8: ...d system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It is therefore necessary to ensure that the booklet is handed to the...

Страница 9: ...the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the...

Страница 10: ...a i32 Unica i36 Capacity 8 litres Maximum system volume 76 litres Pre charge pressure 1 bar 2 5 Dimensions Unica i28 Unica i32 Unica i36 Height mm 780 Width mm 400 Depth mm 358 384 Dry weight kg 40 42...

Страница 11: ...nal R To the side of a boundary 300 mm S To the side of an opening or window on a pitched roof 600 mm T Below an opening or window on a pitched roof 2000 mm V From a vertical terminal to an adjacent o...

Страница 12: ...n vessel to accom modate the increased volume of water when the system is heated It can accept up to 8 litres of expansion from within the system generally this is sufficient however if the system has...

Страница 13: ...itted on a wall of combustible mate rial there is no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed b...

Страница 14: ...An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the highest point in the system and at least 5 metres above...

Страница 15: ...appliance should be mounted on a smooth vertical non combustible surface which must be capable of supporting the full weight of the appliance Care should be exercised when determining the position of...

Страница 16: ...m 29450127 2000m extension 2000 mm 29450128 Telescopic extension 372 519 mm 529 Wall bracket pack 5 208mm Using the template provided mark and drill a 125mm hole for thepassageofthefluepipe Theholesho...

Страница 17: ...ld be drilled LEVEL to ensure any condense fluid that forms is al lowed to drain back to the appliance The fixing holes for the wall mounting bracket should now be drilled and plugged an appropriate t...

Страница 18: ...he required number of flue extensions or bends up to the maximum equivalent flue length between the boiler and vertical flue assembly see fig 17 Ensure that any horizontal sections of the flue system...

Страница 19: ...flue kit for termination The horizontal terminal is supplied with a built in converter box and cannot be shortened A 130mm hole is required for the passage of the concentric terminal through the wall...

Страница 20: ...The boiler is supplied with a 2 metre fly lead This lead can be used for connection to the electrical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to L...

Страница 21: ...liance and carry out a combustion analysis check in accor dance with BS 7967 UK to ensure that correct combustion is occurring see flow chart on page 38 Additionally if the gas valve has been adjusted...

Страница 22: ...RE CHECKED FORTIGHTNESS RE FIT APPLIANCE CASING COMPLETE BENCHMARK CHECKLIST FOR UK ONLY Complete details of the boiler controls installation and com missioning in the Benchmark checklist at the back...

Страница 23: ...the expansion pipe Locate and remove the AAV locking pin G from the pump assembly and remove the AAV assembly H Replace in the reverse order 6 7 1 TOP AUTOMATIC AIR RELEASE VALVE fig 32 Carry out comp...

Страница 24: ...g from their respective connectors Remove the retaining screws W for electrode and remove 6 12 GAS VALVE fig 35 Carry out component removal procedure as described in 6 4 The gas valve must be changed...

Страница 25: ...sion vessel be deemed impractical an external expansion vessel may be fitted to the return pipe as close to the appliance as possible 6 18 1 EXPANSION VESSEL REMOVAL with suf ficient clearance above f...

Страница 26: ...Slacken and unscrew the inlet connection E2 Unscrew the nut H2 Lift the DHW flow switch housing from its seating If necessaryremovethelockingpin I2 fromtheDHWflowswitch Replace in the reverse order e...

Страница 27: ...d 55 C respectively the boiler will fire on minimum 25 power until the primary thermistor exceeds 55 C Thereafter the pump will over run for a period of 30 seconds 7 2 3 HEATING MODE With the selector...

Страница 28: ...of greater than 0 008 1 can be deemed as immediately dangerous 7 5 CHECKING THE EXPANSION VESSEL Carry out the component removal procedure as described in 6 4 You must ensure that the boiler is compl...

Страница 29: ...res on the appliance On completion of any task that required the disconnection and re connection of any electrical wiring or component these checks must be repeated 7 8 FAULT FINDING Before attempting...

Страница 30: ...mary thermistor check wiring Primary flow thermistor over temperature Temporary then Final Reset check appliance operation Temperature differential Final Reset check appliance operation check thermist...

Страница 31: ...e number of rotations corresponding to the maxi mum domestic hot water output table 1 Check the CO2 value table 4 if the value does not match the value given in the table use the gas valve maximum adj...

Страница 32: ...e system temperature required the default temperature for calculating the curve is 20 C The graph below can be used to determine the correct curve setting REFERENCE TEMPERATURE 15 C REFERENCE TEMPERAT...

Страница 33: ...nctioning of the display can be personalised by program ming three parameters When button P1 on the display is held down for at least 10 sec the programming procedure is activated The three parameters...

Страница 34: ...l strip M6 must be moved over to the room thermo stat socket position Vokera external sensor fig 50 Fig 50 M2 External alarm M6 E S external sensor OT opentherm connection OPTIONAL DEVICE 24V TERMINAL...

Страница 35: ...e white white EXTERNAL ALARM M2 white 4 1 1 3 orange red black red black orange CN8 J1 J1 VIS MEDIUM AKL Main PCB P1 Selector switch and heating potentiometer P2 DHW potentiometer P3 Potentiometer to...

Страница 36: ...he appliance to another gas type it is necessary to change the injector and adjust the gas valve CO2 To change the injector see 6 12 1 To adjust CO2 values see 10 6 9 4 GAS SUPPLY The gas supply must...

Страница 37: ...However if the CO2 reading is incorrect the minimum gas pressure must be adjusted as follows locate the minimum adjustment screw fig 44 using a suit able screwdriver remove the protection plug using...

Страница 38: ...MUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 2 ratio l less t t...

Страница 39: ...H FRPPLVVLRQLQJ FKHFNOLVW completed in full 7R LQVWLJDWH WKH ERLOHU JXDUDQWHH WKH ERLOHU QHHGV WR EH UHJLVWHUHG ZLWK WKH PDQXIDFWXUHU ZLWKLQ RQH PRQWK RI WKH LQVWDOODWLRQ 7R PDLQWDLQ WKH ERLOHU JXDUDQ...

Страница 40: ...OHU LQWHUORFN 3URYLGHG ALL SYSTEMS 7KH V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG ERLOHU PDQXIDFWXUHU V LQVWUXFWLRQV Yes KDW V VWHP FOHDQHU ZDV XVHG KDW LQKLELWRU ZDV XVHG 4XDQWLW OLWU...

Страница 41: ...HSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UD...

Страница 42: ...41...

Страница 43: ...42...

Страница 44: ...ies vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve t...

Отзывы: