background image

16

4.5.2 CONCENTRIC VERTICAL FLUE

The appliance can be used with either the Vokèra condensing 

60/100mm concentric 

fl

 ue system or the optional 80/125mm 

concentric 

fl

 ue system.  

NOTE

These instructions relate 

only

 to the Vokèra condensing 

60/100mm concentric 

fl

 ue system. For speci

fi

 c details on the 

installation of the 80/125mm concentric 

fl

 ue system please refer 

to the instructions supplied.

The vertical 

fl

 ue terminal can be connected directly to the ap-

pliance 

fl

 ue outlet. Alternatively, an extension or bend can be 

connected to the appliance 

fl

 ue outlet if desired, however if 

additional bends are 

fi

 tted, a reduction must be made to the 

maximum 

fl

 ue length (see table below).

Reduction for bends

  Bend  

Reduction in maximum 

fl

 ue length for each bend

 45º bend 

1.0 metre (60/100) - 1.0 metre (80/125)  

 90º bend 

1.0 metre (60/100) - 1.5 metre (80/125) 

Vertical 

fl

 ue terminal and accessories

  

Part No. 

Description  

Length

 

 29450122  Vertical 

fl

 ue terminal  

1000 mm 

  531 

Pitched roof 

fl

 ashing plate 

N/A 

  532 

Flat roof 

fl

 ashing plate 

N/A 

  29450123  90-degree bend 

N/A 

  29450124  45-degree bends (pair) 

N/A 

  29450125  500mm extension 

500 mm 

  29450126  1000mm extension 

1000 mm 

  29450127  2000mm extension 

2000 mm 

  29450128  Telescopic extension 

372/519 mm

  529 

Wall bracket pack (5) 

208mm

Using the dimensions given in 

fi

 g. 21 as a reference, mark and 

cut a 125mm hole in the ceiling and/or roof.

Fig. 21

“X”

12/15/20HE = 202mm
25/30/35HE = 218mm

130mm

Fit the appropriate 

fl

 ashing plate to the roof and insert the ver-

tical 

fl

 ue terminal through the 

fl

 ashing plate from the outside, 

ensuring that the collar on the 

fl

 ue terminal 

fi

 ts over the 

fl

 ashing.

The 

fi

 xing holes for the wall-mounting bracket should now be 

drilled and plugged, an ‘appropriate type and quantity of 

fi

 xing 

should be used to ensure that the bracket is mounted securely. 

Once the bracket has been secured to the wall, mount the ap-

pliance onto the bracket.

IMPORTANT

The vertical 

fl

 ue terminal is 1.0 metre in length and cannot be 

cut; therefore it may be necessary to adjust the height of the 

appliance to suit or use a suitable extension.

Connect the vertical 

fl

 ue assembly to the boiler 

fl

 ue spigot us-

ing the 100mm clip, gasket & screws (supplied), ensuring the 

correct seal is made. The 

fl

 ue support bracket (supplied with 

the vertical 

fl

 ue kit) can now be 

fi

 tted. 

If the vertical 

fl

 ue requires extension/s or additional bend/s, 

connect the required number of 

fl

 ue extensions or bends (up 

to the maximum equivalent 

fl

 ue length) between the boiler and 

vertical 

fl

 ue assembly (see 

fi

 g. 17).

Ensure that any horizontal sections of the 

fl

 ue system have a 

minimum 1º; maximum 3º fall back to the boiler (1º = 17mm 

per 1000mm).

NOTE

When cutting an extension to the required length, you must 

ensure that the excess is cut from the plain end of the exten-

sion. Remove any burrs, and check that any seals are located 

properly.

You must ensure that the entire 

fl

 ue system is properly sup-

ported and connected.

4.5.3 TWIN FLUE SYSTEM

The Vokèra twin 

fl

 ue system enables greater 

fl

 ue  distances 

to be achieved than that of a concentric 

fl

 ue system. It can be 

used for horizontal or vertical applications, however the twin 

fl

 ue system must be converted to the dedicated concentric 

fl

 ue kit for termination. It is essential that the installation of the 

twin 

fl

 ue system be carried out in strict accordance with these 

instructions.

GUIDANCE NOTES ON TWIN FLUE INSTALLATION 

• The 

fl

 ue must have a have a minimum 1º; maximum 3º (1º = 

17mm per 1000mm) fall back to the appliance to allow any 

condensate that may form in the 

fl

 ue system to drain via the 

condensate drain. Consideration must also be given to the 

fact that there is the possibility of a small amount of conden-

sate dripping from the terminal.

•  Ensure that the entire 

fl

 ue system is adequately supported, 

use at least one bracket for each extension.

•  As the exhaust outlet pipe can reach very high temperatu-

res it must be protected to prevent persons touching the hot 

surface.

•  The condensate drain pipe must be connected in accordan-

ce with building regulations

Reduction for bends

  Bend  

Reduction in maximum 

fl

 ue length for each bend

  45º bend 

1.0 metre 

  90º bend 

1.5 metre 

Twin 

fl

 ue accessories

  

Part No. 

Description 

Length 

  0225805 

Horizontal 

fl

 ue terminal 

1.0 metre

  0225810 

Vertical 

fl

 ue terminal 

1.0 metre

  359 

Twin adapter kit 

N/A 

  531 

Pitched roof 

fl

 ashing plate 

N/A 

  532 

Flat roof 

fl

 ashing plate 

N/A 

  0225815 

Condensate drain kit 

N/A 

  0225820 

0.25m extension  (pair) 

250mm 

  0225825 

0.5m extension (pair) 

500mm 

  0225830 

1.0m extension (pair) 

1000mm

  0225835 

2.0m extension (pair) 

2000mm

  0225840 

45º bend (pair) 

N/A 

  0225845 

90º bend (pair) 

N/A 

  0225850 

Twin bracket (5) 

N/A 

  0225855 

Single bracket (5) 

N/A 

MOUNTING THE BOILER

The 

fi

 xing holes for the wall-mounting bracket should now be 

drilled and plugged, an appropriate type and quantity of 

fi

 xing 

should be used to ensure that the bracket is mounted securely.  

Once the bracket has been secured to the wall, mount the ap-

pliance onto the bracket.

Содержание Unica i28

Страница 1: ...d member of the Benchmark scheme which aims to improve the standards of installation and which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK c...

Страница 2: ...circulation 12 3A 7 Electrical supply 12 3A 8 Mounting on a combustible surface 12 3A 9 Timber framed buildings 12 3A 10 Inhibitors 12 3A 11 Showers 12 3A 12 Declaration of conformity 12 Installation...

Страница 3: ...ally Dear Customer Your Vok ra Unica boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and effici...

Страница 4: ...nk bullet points The display shows the temperature values Pressure gauge shows the current pressure of your heating system the gauge should be set between 1 and 1 5 BAR When the appliance is oper atin...

Страница 5: ...when frost protection function is ac tive Displayed when hot water pre heat function is enabled Flashes when functioning Displayed if an alarm or fault has been detected Displayed when low system pres...

Страница 6: ...wo minutes before re setting the appliance 2 6 EXPLANATION OF FEATURES Although the Vok ra Unica has been designed for simplicity of use it utilises the latest in boiler technology enabling a host of...

Страница 7: ...ustomerServices 08443910999 UK or 056 7755057 ROI have all your details to hand including full address and postcode relevant contact numbers and your completed appliance log book ALARM CODE CAUSE ACTI...

Страница 8: ...d system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It is therefore necessary to ensure that the booklet is handed to the...

Страница 9: ...the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the...

Страница 10: ...a i32 Unica i36 Capacity 8 litres Maximum system volume 76 litres Pre charge pressure 1 bar 2 5 Dimensions Unica i28 Unica i32 Unica i36 Height mm 780 Width mm 400 Depth mm 358 384 Dry weight kg 40 42...

Страница 11: ...nal R To the side of a boundary 300 mm S To the side of an opening or window on a pitched roof 600 mm T Below an opening or window on a pitched roof 2000 mm V From a vertical terminal to an adjacent o...

Страница 12: ...n vessel to accom modate the increased volume of water when the system is heated It can accept up to 8 litres of expansion from within the system generally this is sufficient however if the system has...

Страница 13: ...itted on a wall of combustible mate rial there is no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed b...

Страница 14: ...An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the highest point in the system and at least 5 metres above...

Страница 15: ...appliance should be mounted on a smooth vertical non combustible surface which must be capable of supporting the full weight of the appliance Care should be exercised when determining the position of...

Страница 16: ...m 29450127 2000m extension 2000 mm 29450128 Telescopic extension 372 519 mm 529 Wall bracket pack 5 208mm Using the template provided mark and drill a 125mm hole for thepassageofthefluepipe Theholesho...

Страница 17: ...ld be drilled LEVEL to ensure any condense fluid that forms is al lowed to drain back to the appliance The fixing holes for the wall mounting bracket should now be drilled and plugged an appropriate t...

Страница 18: ...he required number of flue extensions or bends up to the maximum equivalent flue length between the boiler and vertical flue assembly see fig 17 Ensure that any horizontal sections of the flue system...

Страница 19: ...flue kit for termination The horizontal terminal is supplied with a built in converter box and cannot be shortened A 130mm hole is required for the passage of the concentric terminal through the wall...

Страница 20: ...The boiler is supplied with a 2 metre fly lead This lead can be used for connection to the electrical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to L...

Страница 21: ...liance and carry out a combustion analysis check in accor dance with BS 7967 UK to ensure that correct combustion is occurring see flow chart on page 38 Additionally if the gas valve has been adjusted...

Страница 22: ...RE CHECKED FORTIGHTNESS RE FIT APPLIANCE CASING COMPLETE BENCHMARK CHECKLIST FOR UK ONLY Complete details of the boiler controls installation and com missioning in the Benchmark checklist at the back...

Страница 23: ...the expansion pipe Locate and remove the AAV locking pin G from the pump assembly and remove the AAV assembly H Replace in the reverse order 6 7 1 TOP AUTOMATIC AIR RELEASE VALVE fig 32 Carry out comp...

Страница 24: ...g from their respective connectors Remove the retaining screws W for electrode and remove 6 12 GAS VALVE fig 35 Carry out component removal procedure as described in 6 4 The gas valve must be changed...

Страница 25: ...sion vessel be deemed impractical an external expansion vessel may be fitted to the return pipe as close to the appliance as possible 6 18 1 EXPANSION VESSEL REMOVAL with suf ficient clearance above f...

Страница 26: ...Slacken and unscrew the inlet connection E2 Unscrew the nut H2 Lift the DHW flow switch housing from its seating If necessaryremovethelockingpin I2 fromtheDHWflowswitch Replace in the reverse order e...

Страница 27: ...d 55 C respectively the boiler will fire on minimum 25 power until the primary thermistor exceeds 55 C Thereafter the pump will over run for a period of 30 seconds 7 2 3 HEATING MODE With the selector...

Страница 28: ...of greater than 0 008 1 can be deemed as immediately dangerous 7 5 CHECKING THE EXPANSION VESSEL Carry out the component removal procedure as described in 6 4 You must ensure that the boiler is compl...

Страница 29: ...res on the appliance On completion of any task that required the disconnection and re connection of any electrical wiring or component these checks must be repeated 7 8 FAULT FINDING Before attempting...

Страница 30: ...mary thermistor check wiring Primary flow thermistor over temperature Temporary then Final Reset check appliance operation Temperature differential Final Reset check appliance operation check thermist...

Страница 31: ...e number of rotations corresponding to the maxi mum domestic hot water output table 1 Check the CO2 value table 4 if the value does not match the value given in the table use the gas valve maximum adj...

Страница 32: ...e system temperature required the default temperature for calculating the curve is 20 C The graph below can be used to determine the correct curve setting REFERENCE TEMPERATURE 15 C REFERENCE TEMPERAT...

Страница 33: ...nctioning of the display can be personalised by program ming three parameters When button P1 on the display is held down for at least 10 sec the programming procedure is activated The three parameters...

Страница 34: ...l strip M6 must be moved over to the room thermo stat socket position Vokera external sensor fig 50 Fig 50 M2 External alarm M6 E S external sensor OT opentherm connection OPTIONAL DEVICE 24V TERMINAL...

Страница 35: ...e white white EXTERNAL ALARM M2 white 4 1 1 3 orange red black red black orange CN8 J1 J1 VIS MEDIUM AKL Main PCB P1 Selector switch and heating potentiometer P2 DHW potentiometer P3 Potentiometer to...

Страница 36: ...he appliance to another gas type it is necessary to change the injector and adjust the gas valve CO2 To change the injector see 6 12 1 To adjust CO2 values see 10 6 9 4 GAS SUPPLY The gas supply must...

Страница 37: ...However if the CO2 reading is incorrect the minimum gas pressure must be adjusted as follows locate the minimum adjustment screw fig 44 using a suit able screwdriver remove the protection plug using...

Страница 38: ...MUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 2 ratio l less t t...

Страница 39: ...H FRPPLVVLRQLQJ FKHFNOLVW completed in full 7R LQVWLJDWH WKH ERLOHU JXDUDQWHH WKH ERLOHU QHHGV WR EH UHJLVWHUHG ZLWK WKH PDQXIDFWXUHU ZLWKLQ RQH PRQWK RI WKH LQVWDOODWLRQ 7R PDLQWDLQ WKH ERLOHU JXDUDQ...

Страница 40: ...OHU LQWHUORFN 3URYLGHG ALL SYSTEMS 7KH V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG ERLOHU PDQXIDFWXUHU V LQVWUXFWLRQV Yes KDW V VWHP FOHDQHU ZDV XVHG KDW LQKLELWRU ZDV XVHG 4XDQWLW OLWU...

Страница 41: ...HSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UD...

Страница 42: ...41...

Страница 43: ...42...

Страница 44: ...ies vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve t...

Отзывы: