17
NOTE
Seal the
fl
ue terminal assembly to the wall using cement or a
suitable alternative that will provide satisfactory weatherproof-
ing. The interior and exterior trim can now be
fi
tted.
VERTICAL TERMINATION (
fi
g. 25)
The twin
fl
ue system must be converted to the dedicated con-
centric
fl
ue kit for termination.
The vertical terminal is supplied with a built-in converter box
and cannot be shortened.
A 130mm hole is required for the passage of the concentric
terminal through the ceiling and/or roof.
Depending on site conditions it may be preferable to install the
terminal assembly prior to
fi
tting the twin
fl
ue pipes.
Fit the appropriate
fl
ashing plate to the roof and insert the ver-
tical
fl
ue terminal through the
fl
ashing plate from the outside,
ensuring that the collar on the
fl
ue terminal
fi
ts over the
fl
ashing.
Push-
fi
t the twin
fl
ue pipes onto the concentric to twin converter
ensuring that the exhaust pipe connects to the exhaust con-
nection on the concentric to twin converter.
If necessary cut the plain ends (male) of the twin
fl
ue pipes to
allow connection to the concentric to twin converter.
NOTE
Before cutting twin
fl
ue pipes ensure allowances have been
made for connection onto the previous piece and onto the
concentric to twin converter. The last twin
fl
ue pipes must
be pushed 50mm onto the male spigots of the concentric to
twin converter.
You must ensure that the entire
fl
ue system is properly sup-
ported and connected.
Ensure that any horizontal sections of pipe have a fall
of between 1 & 3º towards the appliance (1º =17mm per
1000mm).
Fig. 24
Fig. 25
Fig. 22
HORIZONTAL TERMINATION (
fi
g. 24)
The twin
fl
ue system must be converted to the dedicated con-
centric
fl
ue kit for termination.
The horizontal terminal is supplied with a built-in converter
box and cannot be shortened.
A 130mm hole is required for the passage of the concentric
terminal through the wall.
The air inlet pipe must always be level with or below, that of
the exhaust pipe.
Depending on site conditions it may be preferable to install the
terminal assembly prior to
fi
tting the twin
fl
ue pipes.
Mark and drill a level 130mm hole for the passage of the horizontal
fl
ue terminal. Insert the terminal assembly into the
fl
ue hole.
Push-
fi
t the twin
fl
ue pipes onto the concentric to twin converter
box ensuring that the exhaust pipe connects to the exhaust
connection on the concentric to twin converter.
If necessary cut the plain ends (male) of the twin
fl
ue pipes to
allow connection to the concentric to twin converter.
NOTE
Before cutting twin
fl
ue pipes ensure allowances have been
made for connection onto the previous piece and onto the
concentric to twin converter. The last twin
fl
ue pipes must be
pushed 50mm onto the male spigots of the concentric to twin
converter.
INSTALLATION OF TWIN ADAPTOR KIT (
fi
g. 22 & 23)
Insert the exhaust connection manifold (A) onto the appliance
fl
ue outlet.
Remove the blanking plate (located to the left of the appliance
fl
ue outlet) and – using the same screws – install the air inlet
plate (B).
Using the hole in the exhaust connection manifold as a guide,
drill a 3mm hole in the appliance
fl
ue spigot and secure the
exhaust manifold connection to the
fl
ue spigot using the screw
provided (C).
Using the two holes in the air inlet plate as a guide, drill a
3mm hole in each and secure the air inlet pipe/bend using
the screws provided.
The twin
fl
ue pipes extensions and accessories can now be
installed by pushing together (the plain end of each extension
or bend should be pushed approximately 50mm into the female
socket of the previous piece).
B
A
C
Fig. 23
1-deg = 17mm