This appliance must be installed by a competent person in 

accordance with and de

fi

 ned by, the Standard Speci

fi

 cation 

(Domestic Gas Installations) Declaration (I.S. 813).

3A.1 RELATED DOCUMENTS

The installation of this boiler must be in accordance with the 

relevant requirements of the local building regulations, the 

current ETCI National Rules for Electrical Installations and the 

bylaws of the local water undertaking.

It should be in accordance also with any relevant requirements 

of the local and/or district authority.

3A.2 LOCATION OF APPLIANCE

The appliance may be installed in any room or internal space, 

although particular attention is drawn to the requirements of 

the current ETCI National Rules for Electrical Installations, and 

I.S. 813, Annex K.

When an appliance is installed in a room or internal space 

containing a bath or shower, the appliance or any control 

pertaining to it must not be within reach of a person using the 

bath or shower.

The location chosen for the appliance must permit the provision 

of a safe and satisfactory 

fl

 ue and termination. The location must 

also permit an adequate air supply for combustion purposes 

and an adequate space for servicing and air circulation around 

the appliance. Where the installation of the appliance will be 

in an unusual location special procedures may be necessary, 

refer to I.S. 813 for detailed guidance on this aspect.

A compartment used to enclose the appliance must be de-

SECTION 3A - GENERAL REQUIREMENTS (EIRE)

3.6.8 FREQUENT FILLING

Frequent 

fi

 lling or venting of the system may be indicative 

of a leak. Care should be taken during the installation of the 

appliance to ensure all aspects of the system are capable of 

withstanding pressures up to at least 3 bar.

3.7 ELECTRICAL SUPPLY

The appliance is supplied for operation on 230V @ 50Hz electri-

cal supply; it must be protected with a 3-amp fuse. The method 

of connection to the mains electricity supply must allow for 

complete isolation from the supply. The preferred method is by 

using a double-pole switch fused spur with a contact separation 

of at least 3,5mm (3° high-voltage category). The switch must 

only supply the appliance and its corresponding controls, i.e. 

time clock, room thermostat, etc. Alternatively an un-switched 

shuttered socket with a fused 3-pin plug both complying with 

BS 1363 is acceptable.

3.8 MOUNTING ON A COMBUSTIBLE

 

SURFACE

If the appliance is to be 

fi

 tted on a wall of combustible mate-

rial, there is no requirement for a sheet of 

fi

 reproof material to 

protect the wall.

3.9 TIMBER FRAMED BUILDINGS

If the appliance is to be 

fi

 tted in a timber framed building, it 

should be 

fi

 tted in accordance with the Institute of Gas Engineers 

publication (IGE/UP/7) ‘Guide for Gas Installations in Timber 

Frame Buildings’. 

3.10 INHIBITORS

Vokèra recommend that an inhibitor - suitable for use with 

aluminium heat exchangers - is used to protect the boiler and 

system from the effects of corrosion and/or electrolytic action.  

The inhibitor must be administered in strict accordance with 

the manufacturers instructions*.

*Water treatment of the complete heating system - including 

the boiler - should be carried out in accordance with BS 7593 

and the Domestic Water Treatment Association’s (DWTA) code 

of practice.

fl

 ow/return 

pipe

control 

valve

temporary 

connection

control 

valve

supply 

pipe

double 

check valve

Fig. 8

Fig. 9

Make-up vessel 
or tank

Automatic 
air-vent

Non-return

valve

Stopcock

5.0 metres minimum

Heating 
return

3.11 SHOWERS

If the appliance is intended for use with a shower, the shower 

must be thermostatically controlled and be suitable for use with 

a combination boiler.

signed and constructed speci

fi

 cally for this purpose. An exist-

ing compartment/cupboard may be utilised provided that it is 

modi

fi

 ed to suit.

This appliance is not suitable for external installation.

3A.3 GAS SUPPLY

The gas meter – as supplied by the gas supplier – must be 

checked to ensure that it is of adequate size to deal with the 

maximum rated input of all the appliances that it serves. Instal-

lation pipes must be 

fi

 tted in accordance with I.S. 813.

Pipe work from the meter to the appliance must be of adequate 

size. Pipes of a smaller size than the appliance gas inlet con-

nection must not be used. The installation must be tested for 

tightness in accordance with I.S. 813. 

If the gas supply serves more than one appliance, it must be 

ensured that an adequate supply is maintained to each appli-

ance when they are in use at the same time.

3A.4 FLUE SYSTEM

The terminal should be located where the dispersal of combustion 

products is not impeded and with due regard for the damage 

and discoloration that may occur to building products located 

nearby.  The terminal must not be located in a place where it 

is likely to cause a nuisance (see I.S. 813).

In cold and/or humid weather, water vapour will condense 

on leaving the terminal; the effect of such pluming must be 

considered.

If installed less than 2m above a pavement or platform to 

which people have access (including balconies or 

fl

 at  roofs) 

Содержание Unica i28

Страница 1: ...d member of the Benchmark scheme which aims to improve the standards of installation and which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK c...

Страница 2: ...circulation 12 3A 7 Electrical supply 12 3A 8 Mounting on a combustible surface 12 3A 9 Timber framed buildings 12 3A 10 Inhibitors 12 3A 11 Showers 12 3A 12 Declaration of conformity 12 Installation...

Страница 3: ...ally Dear Customer Your Vok ra Unica boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and effici...

Страница 4: ...nk bullet points The display shows the temperature values Pressure gauge shows the current pressure of your heating system the gauge should be set between 1 and 1 5 BAR When the appliance is oper atin...

Страница 5: ...when frost protection function is ac tive Displayed when hot water pre heat function is enabled Flashes when functioning Displayed if an alarm or fault has been detected Displayed when low system pres...

Страница 6: ...wo minutes before re setting the appliance 2 6 EXPLANATION OF FEATURES Although the Vok ra Unica has been designed for simplicity of use it utilises the latest in boiler technology enabling a host of...

Страница 7: ...ustomerServices 08443910999 UK or 056 7755057 ROI have all your details to hand including full address and postcode relevant contact numbers and your completed appliance log book ALARM CODE CAUSE ACTI...

Страница 8: ...d system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It is therefore necessary to ensure that the booklet is handed to the...

Страница 9: ...the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the...

Страница 10: ...a i32 Unica i36 Capacity 8 litres Maximum system volume 76 litres Pre charge pressure 1 bar 2 5 Dimensions Unica i28 Unica i32 Unica i36 Height mm 780 Width mm 400 Depth mm 358 384 Dry weight kg 40 42...

Страница 11: ...nal R To the side of a boundary 300 mm S To the side of an opening or window on a pitched roof 600 mm T Below an opening or window on a pitched roof 2000 mm V From a vertical terminal to an adjacent o...

Страница 12: ...n vessel to accom modate the increased volume of water when the system is heated It can accept up to 8 litres of expansion from within the system generally this is sufficient however if the system has...

Страница 13: ...itted on a wall of combustible mate rial there is no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed b...

Страница 14: ...An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the highest point in the system and at least 5 metres above...

Страница 15: ...appliance should be mounted on a smooth vertical non combustible surface which must be capable of supporting the full weight of the appliance Care should be exercised when determining the position of...

Страница 16: ...m 29450127 2000m extension 2000 mm 29450128 Telescopic extension 372 519 mm 529 Wall bracket pack 5 208mm Using the template provided mark and drill a 125mm hole for thepassageofthefluepipe Theholesho...

Страница 17: ...ld be drilled LEVEL to ensure any condense fluid that forms is al lowed to drain back to the appliance The fixing holes for the wall mounting bracket should now be drilled and plugged an appropriate t...

Страница 18: ...he required number of flue extensions or bends up to the maximum equivalent flue length between the boiler and vertical flue assembly see fig 17 Ensure that any horizontal sections of the flue system...

Страница 19: ...flue kit for termination The horizontal terminal is supplied with a built in converter box and cannot be shortened A 130mm hole is required for the passage of the concentric terminal through the wall...

Страница 20: ...The boiler is supplied with a 2 metre fly lead This lead can be used for connection to the electrical supply Connect the fly lead to a fused plug or fused isolator in the following way brown wire to L...

Страница 21: ...liance and carry out a combustion analysis check in accor dance with BS 7967 UK to ensure that correct combustion is occurring see flow chart on page 38 Additionally if the gas valve has been adjusted...

Страница 22: ...RE CHECKED FORTIGHTNESS RE FIT APPLIANCE CASING COMPLETE BENCHMARK CHECKLIST FOR UK ONLY Complete details of the boiler controls installation and com missioning in the Benchmark checklist at the back...

Страница 23: ...the expansion pipe Locate and remove the AAV locking pin G from the pump assembly and remove the AAV assembly H Replace in the reverse order 6 7 1 TOP AUTOMATIC AIR RELEASE VALVE fig 32 Carry out comp...

Страница 24: ...g from their respective connectors Remove the retaining screws W for electrode and remove 6 12 GAS VALVE fig 35 Carry out component removal procedure as described in 6 4 The gas valve must be changed...

Страница 25: ...sion vessel be deemed impractical an external expansion vessel may be fitted to the return pipe as close to the appliance as possible 6 18 1 EXPANSION VESSEL REMOVAL with suf ficient clearance above f...

Страница 26: ...Slacken and unscrew the inlet connection E2 Unscrew the nut H2 Lift the DHW flow switch housing from its seating If necessaryremovethelockingpin I2 fromtheDHWflowswitch Replace in the reverse order e...

Страница 27: ...d 55 C respectively the boiler will fire on minimum 25 power until the primary thermistor exceeds 55 C Thereafter the pump will over run for a period of 30 seconds 7 2 3 HEATING MODE With the selector...

Страница 28: ...of greater than 0 008 1 can be deemed as immediately dangerous 7 5 CHECKING THE EXPANSION VESSEL Carry out the component removal procedure as described in 6 4 You must ensure that the boiler is compl...

Страница 29: ...res on the appliance On completion of any task that required the disconnection and re connection of any electrical wiring or component these checks must be repeated 7 8 FAULT FINDING Before attempting...

Страница 30: ...mary thermistor check wiring Primary flow thermistor over temperature Temporary then Final Reset check appliance operation Temperature differential Final Reset check appliance operation check thermist...

Страница 31: ...e number of rotations corresponding to the maxi mum domestic hot water output table 1 Check the CO2 value table 4 if the value does not match the value given in the table use the gas valve maximum adj...

Страница 32: ...e system temperature required the default temperature for calculating the curve is 20 C The graph below can be used to determine the correct curve setting REFERENCE TEMPERATURE 15 C REFERENCE TEMPERAT...

Страница 33: ...nctioning of the display can be personalised by program ming three parameters When button P1 on the display is held down for at least 10 sec the programming procedure is activated The three parameters...

Страница 34: ...l strip M6 must be moved over to the room thermo stat socket position Vokera external sensor fig 50 Fig 50 M2 External alarm M6 E S external sensor OT opentherm connection OPTIONAL DEVICE 24V TERMINAL...

Страница 35: ...e white white EXTERNAL ALARM M2 white 4 1 1 3 orange red black red black orange CN8 J1 J1 VIS MEDIUM AKL Main PCB P1 Selector switch and heating potentiometer P2 DHW potentiometer P3 Potentiometer to...

Страница 36: ...he appliance to another gas type it is necessary to change the injector and adjust the gas valve CO2 To change the injector see 6 12 1 To adjust CO2 values see 10 6 9 4 GAS SUPPLY The gas supply must...

Страница 37: ...However if the CO2 reading is incorrect the minimum gas pressure must be adjusted as follows locate the minimum adjustment screw fig 44 using a suit able screwdriver remove the protection plug using...

Страница 38: ...MUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 2 ratio l less t t...

Страница 39: ...H FRPPLVVLRQLQJ FKHFNOLVW completed in full 7R LQVWLJDWH WKH ERLOHU JXDUDQWHH WKH ERLOHU QHHGV WR EH UHJLVWHUHG ZLWK WKH PDQXIDFWXUHU ZLWKLQ RQH PRQWK RI WKH LQVWDOODWLRQ 7R PDLQWDLQ WKH ERLOHU JXDUDQ...

Страница 40: ...OHU LQWHUORFN 3URYLGHG ALL SYSTEMS 7KH V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG ERLOHU PDQXIDFWXUHU V LQVWUXFWLRQV Yes KDW V VWHP FOHDQHU ZDV XVHG KDW LQKLELWRU ZDV XVHG 4XDQWLW OLWU...

Страница 41: ...HSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UD...

Страница 42: ...41...

Страница 43: ...42...

Страница 44: ...ies vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve t...

Отзывы: