Assembly Instructions
54
Subject to change without notice
VH / VTS / VBL / VAI Translation of the original operating manual
US edition 2021/01
Contact:
+49(0)92 78-774 33-0
+49(0)92 78-774 33-11
www.vogt-tec.com
13�6 Attaching scrapers to the M 5000 scraper holder,
assembly from below
13�7 Assembling the cone holder in the conical receiver
1. Insert the cone holder into the chisel holder.
2. Insert the cone holder into the chisel receiver.
3. Align the cone position with the T-handle
4. Put the VOGT compressed air equipment into ope-
ration (see Sections 3 and 4).
5. Let the equipment run briefly, the cone holder will
drive itself in automatically
Retaining lock nut
Scraper
CAUTION: beveled side below!
Reinforcing sheet metal
(black plate)
from 160 mm wigth: large
Reinforcing sheet
Scraper must rest
on the edge
Scraper holder M 5000 / M 5000.18
Fertig montiert:
Schaber
Holding plate with pressed-in
screws
Fertig montiert:
Schaber mit
Umlenkvorrichtung
Mounting devices 1x Holding plate, 1x Reinforcing sheet metal, 2x Retaining lock nut
902 020
Mounted:
Scraper till 120 mm
Scraper from 160 mm
Insert the holding
plate from below
through the scraper
holder.
Push the scraper
on to the threaded
pins.
Push the large
reinforcement plate
(160 scraper and above) on
to the threaded pins.
Push the small
reinforcement plate
(black plate) on to
the threaded plate.
Screw on the wedge
securing nuts by
hand.
Tighten with a
wrench.
Assembly Instructions
Содержание VH 25
Страница 2: ... 2 ...