![Vicon RV 1601 Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/vicon/rv-1601/rv-1601_operation-manual_1012863058.webp)
Chapter 9
G0201WAD3EN
56
twine tie
9.5 Choice of the twine
Choose a good quality twine in order to ensure a
satisfactory wrapping function.
The system is suitable for sisal twine (200 through
330 m/kg; 100 - 164 yd/lb) and for synthetic twine (400
through 700 m/kg; 200 - 350 yd/lb).
9.5.1
Positioning the twine spools into the
boxes
1
Place the spools into the box.
2
Connect the twine ends of the spools.
3
Guide the twine through the twine brake.
9.5.2
Routing the twine - INFOBALE
1
Set the main switch (1) of the control box to II (emer-
gency control).
2
Flip switch (1) on the machine box to emergency con-
trol (II).
3
Control the twine tying tube using toggle button (8) on
the control box.
4
Guide the twine both at lh and rh side through the
mechanism as shown in the fig.
Use the spring (4) to guide the twine through the tube.
The eind of the twine shall protrude about 10 cm the
tying tubes (also see 9.4).
DANGER
Special caution is required within in the area of the
very sharp twine cutting knife that cuts the twine at the
end of every cycle!
5
Using button (8) on the control box set the system into
its basic position.
W
A0013
(RE)
STAR
T
STOP
PROG
AUTO
AUTO
Ps
50
80
START
5
4
7
9
START BINDING
POWER
2
1
8
SOS
000000
PROG
W
A0213
1
5
6
2
3
4
W
G002
7
4
Содержание RV 1601
Страница 1: ...G0201WAD3EN RV 1601 RV 1901 Operation manual WA0080 ...
Страница 2: ......
Страница 4: ......
Страница 8: ...G0201WAD3EN 6 Preface ...
Страница 106: ...G0201WAD3EN 104 ...
Страница 107: ......