Vertiv™ NetSure™ IPE Series Rectifier Installation and User Manual
16
3.4
Customer Wiring to Terminal Blocks Located Inside Rectifier Case
3.4.1
General
If any of the six (6) cable glands located on the bottom of the unit are left unused, screw the provided sealing pin onto the unused
cable gland. See
3.4.2
Procedure
1.
Strip cord insulation as required. Refer to
2.
Install the ferrule or ring lug as required. Refer to
Figure 18:
Strip Cord Insulation and Install Ferrule or Ring Lug (as required) (cont’d on next page)
UL2464 22 AWG (8 Conductor)
Maximum cable diameter is 6 mm (0.24 inch).
Strip 5 mm of insulation off the wires.
72 mm
(2.83 in.)