Vertiv™ NetSure™ IPE Series Rectifier Installation and User Manual
15
3
Making Electrical Connections
3.1
Important Safety Instructions
DANGER!
Adhere to the “Important Safety Instructions” starting on page vi.
3.2
Wiring Considerations
All wiring and branch circuit protection should follow the current edition of the American National Standards Institute (ANSI)
approved National Fire Protection Association's (NFPA) National Electrical Code (NEC), and applicable local codes. For operation in
countries where the NEC is not recognized, follow applicable codes.
3.3
Frame Ground Connection
For grounding requirements, refer to the current edition of the American National Standards Institute (ANSI) approved National Fire
Protection Association’s (NFPA) National Electrical Code (NEC), applicable local codes, and your specific site requirements.
Captive fasteners (for M8 bolts) for frame ground lugs are located on each mounting bracket. Holes are spaced on 1-inch centers.
Refer to
for location.
Figure 17:
Frame Grounding Location
Captive fasteners for
frame ground lugs (M8
on 1-inch centers).
Captive fasteners for
frame ground lugs (M8
on 1-inch centers).