b)
Position the front ceramic coal support onto the burner support as
shown below in Fig. 22
Fig. 22
c)
Fit four large coals between the front rail and the fuel-bed matrix as
shown below in Fig. 23.
Fig. 23
22
Positioning of front ceramic pebble support onto burner
support