4.9.6
It is now necessary to correctly tension the operating cable. To do this,
first set the control lever to the horizontal (central position), this is the
position which creates maximum tension in the operating cable.
Pull the free end of the operating cable through the operating arm until it
is finger tight and secure with screw into operating arm (do not over
tighten).
4.9.7
Slide the operating arm fully to the right hand position and hold in
position, slide the control lever relative to the cable until the cable
retaining screw lines up with the hole in the spacer frame. This sets the
control lever in the correct position. Hold the hexagonal locking bush
with a spanner and tighten the retaining screw using the 2mm allen key.
Move the control lever fully downwards and check that the left hand
micro-switch operates the igniter and that the control valve spindle is
fully depressed. Move the control lever upwards to the “off” position
and check that the right hand (cut-off) micro-switch operates. Check
that the control lever operates smoothly and safely.
Remote Control Fires - For Diagrams refer to section 2
5.1
Removing the RC Burner Assembly (RC models)
5.1.1
Prepare work area (lay down dust sheets etc.)
5.1.2
Remove the trim. Lift the fender and ash pan cover out of the way and
put them in a safe location. Isolate the gas supply. Remove the glass
panel, unscrewing the top and side retaining brackets, see page 11 &
12 of this manual for information. Carefully lift clear the glass panel.
Remove the coals / pebbles, front ceramic from the rail and fuel-bed
base matrix. Remove all of the loose coals / pebbles and front ceramic
rail. Unscrew the two pozi-drive fixing screws which secure the burner
heat shield and remove it from the fire.
5.1.4
Unscrew the 2 off burner retaining screws on the side brackets, the
burner should then be lifted out of the firebox.
NOTE
: Please take care with the wiring loom
5.1.5
To refit the burner assembly, re-assemble in reverse order and carry out
a gas tightness test. Refit the burner heat shield then refit the coals /
pebbles referring to section 3 for the correct coal / pebble layout. Refit
the glass panel and glass panel retaining trims. The fender and ash pan
cover or fascia can now be re-positioned.
5.2
Removing the Remote Gas Valve from the fire (RC models)
5.2.1
Prepare work area (lay down dust sheets etc.)
41