background image

MEDICA Pro 30/60/120 US Operator Manual 

ELGA

 

 

Page 26

 

MEDICA Pro 30/60/120 US MANU40594 Version 1 - 07/14 

7. 

EMERGENCY BYPASS 

 

 

Contact your local service provider before 
putting the unit into emergency bypass. 

7.1 

Emergency bypass (MEDICA R/RE/RX) 

1. 

Ensure the process is OFF 

2. 

Disconnect the electrical supply 

3. 

Open the doors. 

4. 

Close valve 1 

 

5. 

Close valve 2 

 

6. 

Remove yellow plastic cover 3 

 

7. 

Open valve 3 

 

 

8. 

Close  valve  3  when  there  is  no  requirement  for 

purified water. 

9. 

Monitor  water  purity  independently  or  install  new 

Medpure L1 cartridges to guarantee water purity. 

 

7.2 

Emergency bypass (MEDICA B/S/SE) 

1. 

Ensure the process is OFF 

2. 

Disconnect the electrical supply 

3. 

Open the doors. 

4. 

Close valve 1 

 

5. 

Valve 2 should remain closed 

 

6. 

Remove yellow plastic cover 3 

7. 

Open valve 3 

 

8. 

Monitor the level in the reservoir to ensure it does not 

overflow.  

9. 

Monitor  water  purity  independently  or  install  new 

Medpure L1 cartridges to guarantee water purity. 

All manuals and user guides at all-guides.com

Содержание ELGA MEDICA Pro 120

Страница 1: ...MEDICA Pro 30 60 120 US Operator Manual All manuals and user guides at all guides com a l l g u i d e s c o m...

Страница 2: ...All manuals and user guides at all guides com...

Страница 3: ...except as authorized by contract or other written permission from VWS Ltd The copyright and all restrictions on reproduction and use apply to all media in which this information may be placed VWS Ltd...

Страница 4: ...creen 030 17 4 2 Continuous Recirculation 24 7 screen 029 17 5 MAINTENANCE 18 5 1 Replacing Composite Vent Filter L136 18 5 2 Replacing Medpure L1 LC174 18 5 3 Replacing Ultra Microfilter LC109 19 5 4...

Страница 5: ...ion 1 3 HEALTH AND SAFETY NOTES WARNING WARNINGS ARE GIVEN WHERE FAILING TO OBSERVE THE INSTRUCTIONS COULD RESULT IN INJURY OR FATALITY CAUTION Cautions are given where failure to observe the instruct...

Страница 6: ...alth COSHH Material safety data sheets covering the various replaceable components are available upon request Contact your local ELGA LabWater distributor 1 8 Consumables Consumables Typical Service L...

Страница 7: ...e quickly installed and commissioned It is recommended that a trained ELGA representative carry out the installation of the product 2 2 Commissioning The unit is supplied with the software set in a co...

Страница 8: ...range of control icons General icons are as follows Further icons are described in the appropriate sections a complete listing is included in Section 11 BUTTON ICON Function PROCESS Turns the unit on...

Страница 9: ...the commissioning routine the following steps should be carried out to set up your choices Note Your choices can be changed and implemented during normal operation It is not necessary to stop the uni...

Страница 10: ...d to step 4 2 PRESS and HOLD to increase or to decrease day 3 PRESS to step cursor onto month 4 PRESS to increase or to decrease month 5 PRESS to step cursor onto year 6 PRESS to increase or to decrea...

Страница 11: ...o proceed to step 7 2 PRESS TICK Step 7 Water purity unit setting screen 023 This screen allows preferred displayed units of water purity to be set to either M cm or S cm This only affects the quality...

Страница 12: ...ect the value at which the product water purity alarm will activate The alarm does not stop the unit and will automatically reset if the purity level recovers 1 PRESS to select alarm point increments...

Страница 13: ...en demand for water fluctuates CAUTION During long periods of continuous operation and low usage the water temperature will rise It is recommended that this function is only used when water usage is o...

Страница 14: ...enabled OR PRESS to step to box 2 Note A highlighted box indicates that the unit will be operational on that day between the times set in step 14 3 REPEAT step 15 item 2 to select further operating da...

Страница 15: ...permeate is compared to that of the feedwater Enter the feedwater conductivity to obtain an accurate measurement 1 PRESS to reduce the value to the correct reading 2 PRESS to accept Step 19 Data outpu...

Страница 16: ...ntil all User keys are registered maximum of 6 users 5 PRESS to complete settings Step 22 Programming of Sanitization Keys screen 038 Sanitization Keys are required to start a Sanitization These keys...

Страница 17: ...lacement date and proceed to CVF Reminder 2 PRESS to confirm that resetting is required OR PRESS to abort reset 3 PRESS Step 3 Composite Vent filter CVF replacement date 1 PRESS button to reset CVF re...

Страница 18: ...date 1 PRESS button to reset UMF replacement date OR PRESS to accept replacement date and proceed to Sanitization reminder 2 PRESS confirm that resetting is required OR PRESS to abort reset 3 PRESS St...

Страница 19: ...by PRESSING During the sleep period the unit will run in intermittent recirculation 10 minutes every two hours to maintain water purity around the distribution loop 4 2 Continuous Recirculation 24 7 s...

Страница 20: ...OPEN front doors and locate CVF 3 UNSCREW old CVF and discard 4 UNPACK new CVF 5 WRITE the installation date on the label of the filter for future reference 6 INSTALL filter 7 SWITCH on power 8 RESET...

Страница 21: ...rofilter LC109 The Ultra Microfilter UMF should be replaced in the following circumstances When indicated by the consumable alarm After a maximum of 12 months use Product flow is no longer adequate Pr...

Страница 22: ...op and bottom of the lamp assembly 6 REMOVE electrical connectors from top and bottom and take lamp from housing WARNING IT IS STRONGLY RECOMMENDED THAT DURING THE HANDLING OF THE LAMP CUT RESISTANT G...

Страница 23: ...E power 2 OPEN front doors 3 LOCATE Protek 4 Remove lid from break tank and RELEASE any residual system pressure by OPERATING float valve 5 TWIST to RELEASE clip and OPEN retaining clamp at top of car...

Страница 24: ...om the E cartridge 5 REMOVE used cartridge from clip and discard in accordance with local regulations 6 TAKE new cartridge 7 REMOVE sealing plugs from inlet and outlet ports 8 LOCATE new cartridge in...

Страница 25: ...be lower with clean feed water well maintained pre treatment low temperatures and heavy usage WARNING ALWAYS WEAR RUBBER GLOVES APRON AND FACEMASK DO NOT BREATHE FUMES OR ALLOW TO COME IN CONTACT WITH...

Страница 26: ...5 PRESS to enter RO sanitization 6 UNSCREW the large white lid on the left of the unit 7 ADD 50ml of Minncare Cold Sterilant 8 REPLACE lid Confirmation sanitiant is added 9 PRESENT GREEN sanitization...

Страница 27: ...will automatically progress to the next step but the effectiveness of the sterilant may be reduced 14 PRESS the process button Once the step within the sanitization is complete the unit will go strai...

Страница 28: ...3 8 Close valve 3 when there is no requirement for purified water 9 Monitor water purity independently or install new Medpure L1 cartridges to guarantee water purity 7 2 Emergency bypass MEDICA B S S...

Страница 29: ...t the analyzer may be calculated as follows Single Pack Time between pack changes 120 000 Conductivity of mains water x Water consumption of analyzer l hr Example Mains water conductivity 605 S cm Wat...

Страница 30: ...nical support 672 94 Recirc loop over temperature PRESS mute to silence alarm Water temperature is unacceptably high 50 C Contact Technical support 93 LC175 LC177 Protek L1 incorrectly installed PRESS...

Страница 31: ...Key Auto restart Locked Scroll back Menu Step back Mute alarm Bell Night Standby Option OFF Calibration point Option ON Cancel Output Clock Recirculate Date Reset Day Right Down Sanitization PASSkey...

Страница 32: ...edia filter with a minimum flow rate of 20l min Iron manganese Fe Mn ppm 0 1 Protek L1 or L2 0 1 Back washable pre filter Organics TOC ppm C 3 Protek L1 or L2 3 Cylinder of carbon sized correctly TEMP...

Страница 33: ...afe Water temperature alarm Water purity alarm Leak detection alarm Access restricted by User Recognition key Low voltage control circuit 24 V dc Visual alarms Audible alarms Output to operate 24 V dc...

Страница 34: ...e deemed to have failed of its essential purpose so long as VWS UK Ltd is willing and able to repair or replace any nonconforming VWS UK Ltd product or part VWS UK shall not be liable for consequentia...

Страница 35: ...s other than VWS UK Ltd or its affiliates Non VWS UK Ltd products are covered by the warranty if any extended by the Product manufacturer VWS UK Ltd hereby assigns to the purchaser any such warranty h...

Страница 36: ...x 44 0 203 567 7205 E mail techsupport elgalabwater com For the address of your nearest ELGA LabWater Sales and Service office visit the country list on our website http www elgalabwater com or contac...

Отзывы: