Cleaning and washing instructions

Cleaning of electrical and mechanical parts

The VENDLET Standard is machine washable by automatic 

washing systems according to EN 60101-2-52.

If cleaned manually: 

Clean the electrical and mechanical parts with a damp cloth 

with water or a mild soap solution and then wipe the parts 

with a dry cloth. You may also use water under pressure, but 

the system must not be hosed down directly with a high-pres-

sure cleaner. 

Disinfection:

You could also use a dry cloth with disinfectant. All common 

disinfectants for normal use present in care homes and hospi-

tals may be used.  

If using washing machine:

Only flat squirt nozzles are allowed. An approved setup could 

be: 

a.  Water Pressure 3 bar, water volume 5,61 L/min, 

 

 

dispersion angle 120° flat squirt nozzle. 

b.  2 min washing with 70° C water at a pH-value 5-8, 

 

 

with cleaning agent. 

c.  20 s rinse with 85° C at a pH-value 5-8 and 

 

 

0,2% rinsing solution

d.  10 min cooling at 20° C ambient temperature

When washed by automatic washing machine, VENDLET 

 

Standard must dry for 24hr before use.

Mounting during washing:

  

Raise both side rails and turn the motor bars so that groove for 

attaching the turning sheet is facing downwards.

The components should be mounted with the plug inserts 

facing downwards or situated so that they are protected from 

direct impact from the water nozzles. The lid covering the 

cable inserts on the control box must be closed during the en-

tire cleaning procedure. During washing all electrical sockets/

outlets in the control unit and the control unit extension must 

be fitted with either a cable or a socket cover plug to eliminate 

ingress of water.

Equally, all cables must be plugged in and guided in such 

a manner, that there is no apparent strain to the interface 

between the cable and its connection (for instance between 

cable and control box). It is furthermore  recommended that 

the control box is situated as far away from the water nozzles 

as possible. 

Industrial high-pressure cleaning is NOT allowed. 

Water: 

Degree of hardness must not be more than 5° dH and no 

 

demineralized water can be used.

Washing instructions, slide sheet

Recommended washing temperature: 60°C

 

Do not add fabric conditioner.

Do not tumble-dry

Do not iron

Washing instructions, turning sheet

Recommended washing temperature: 90°C 

Max. 4% shrinking

Tumble-dry at normal temperatures

Iron or mangle at high temperatures

Recommended cleaning agents: 

• 

Sekumatic FDR or FRE from Ecolab

• 

Neodisher Dekonta from Dr. Weigert

• 

Thermosept NDR from Schulke or similar with a 

 

 

pH-value of 5-8 and in a concentration of 0.5%.

Recommended rinsing solution: 

• 

Sekumatic FKN from Ecolab

• 

Neodisher BP or TN from Dr. Weigert

• 

Thermosept BSK from Schulke or similar with a 

 

 

pH-value of 5-8 and in a concentration of 0.2%.

The rinsing agents must not contain caustic solutions. They 

must not change the surface structure or adhesive properties 

of the plastic and must not break down grease.

The systems must not be hosed down with 

high pressure cleaner

Interconnecting cables must remain plugged in 

during cleaning to prevent the ingress of water

Cleaning with steam cleaner is not permitted

Содержание STANDARD

Страница 1: ...VALUE IN CARING MANUAL STANDARD...

Страница 2: ...ients in bed Classification rule Class I acc to rule 1 and 13 of annex VIII in EU 2017 745 The product complies with the following standards EN 60601 2 52 2010 Medical electrical equipment Part 2 52 P...

Страница 3: ...manual must be followed Vendlet ApS shall not be liable should VENDLET Standard be used modified or assembled in a way that is not described in this manual This manual is divided into three parts Par...

Страница 4: ...EVENT OF AN INCIDENT 10 SYMBOLS 11 PART 1 General information PART 2 User manual OPERATION 12 How to use VENDLET Standard 12 Turning 12 Moving from one side of the bed to the other 13 Repositioning t...

Страница 5: ...l hand control 32 Battery backup 32 Side rail bumper 32 PART 3 Technical manual Attaching the turning sheet before use 19 What should I do if the turning sheet is rolled askew on the bars 19 Changing...

Страница 6: ...ng 34 MAINTENANCE CHECK 35 Annual check 35 Electrical parts 35 Mechanical parts 35 Sheets 35 Functional tests 35 Replacements of parts 35 TROUBLESHOOTING TECHNICIANS 36 TECHNICAL DATA 37 Battery backu...

Страница 7: ...lient is very restless in bed or has an untypical anatomy Independent living VENDLET Standard is not designed to be operated by the cli ents themselves However if a risk assessment made by the respons...

Страница 8: ...clicking the The emergency release nut must only be used in case of emer gency see page 21 or malfunction of the actuators VENDLET Standard hand control Power with light stop button Tighten the sheet...

Страница 9: ...Therefore long loose hair should be collect ed before moving and handling the client Be aware that the client does not get too close to the edge of the bed as there is a risk of falling out of the bed...

Страница 10: ...ra compression at the edge of the mattress When alternating air mattresses are used it should be possible to inflate the mattress to a firm state before VENDLET Standard is operated Soft mattresses wi...

Страница 11: ...After 2 min of continuous use it requires 18 min rest Max 350W 80 sec 175W 40sec 25 C In continuous use at 25 C 350 W can be supplied for 80 sec then the power consumption will be reduced to 175 W for...

Страница 12: ...with VENDLET Standard enables caregivers to work on a one to one basis one hand is used to operate the hand control and the other hand is free to guide the arms and legs of the client In order to impr...

Страница 13: ...he button to reduce speed 4 Press the or button on the hand control to move the client to the side towards you 8 The client now lies on his her right side 9 Press the and button to slacken the sheet b...

Страница 14: ...r end of the bar 4 1 Turn VENDLET Standard on by double clicking the button 2 Press the and button to to lower the bars if they have been raised 3 If necessary press once or twice on the button to red...

Страница 15: ...his her side 4 Place the sling along the back of the client and make sure that the sling is centred and correctly placed in accordance with the instructions of the sling manufacturer 4 5 Use the VENDL...

Страница 16: ...is room for breathing 7 To return to a supine position press the button to raise the red bar and press the button to wind the tur ning sheet onto the red bar VENDLET Standard now turns the client to s...

Страница 17: ...sure relieving properties of the mattresses To prevent interference with the function of alternating air mattresses the turning sheet must be sufficiently slackened before a client is left unattended...

Страница 18: ...side is facing upwards 1 2 2 Fasten the velcro straps around the edge of the mattress support platform It is important that the straps are fas tened around the edge of the platform under the mattress...

Страница 19: ...e strip at the opposite edge of the turning sheet into the groove on the other bar 6 Use this bar to pull in the turning sheet by pressing the or button until the sheet covers the mattress evenly with...

Страница 20: ...g sheet onto the bar 2 4 5 5 Use the opposite bar to move the client to a supine posi tion on top of the new and the old turning sheets 6 3 4 Allow approx half of the new turning sheet to roll onto th...

Страница 21: ...you do not have power 1 Manually lift the bar and directly afterwards activate the emergency release by pushing the emergency release nut upwards 2 Once the bar has been released continue pressing th...

Страница 22: ...uld Yes No 3 Are the nylon straps attached to the bed frame and all the support bars Yes No 4 Is the turning sheet in good condition and does the sheet run over the bars Yes No 5 Is the slide sheet fa...

Страница 23: ...re During washing all electrical sockets outlets in the control unit and the control unit extension must be fitted with either a cable or a socket cover plug to eliminate ingress of water Equally all...

Страница 24: ...en the client is lying in bed Is the turning sheet running under the bars The sheet must be over the bars Are all plugs properly connected on the control unit The hand control buttons are not working...

Страница 25: ...and contact the distributor in case of obvious damage Parts list 1 unit Blue side complete 1 unit Red side complete 1 unit Suspension bracket for control unit 1 unit Control unit 1 unit Control unit...

Страница 26: ...ttress and the side rail on both sides of the mattress If the distance is above 6 cm the risk of entrapment must be evalu ated for the specific combination of bed mattress patient and VENDLET system L...

Страница 27: ...the bed must be at least 317 kg to be able to handle a user weight of 250 kg Max user weight VENDLET Standard Other equipment Required Bed SWL 250 kg 42 kg 25 kg 317 kg In intensive care situations th...

Страница 28: ...in the bottom of the bracket Tighten the button head bolt evenly Tighten the bracket at the foot end 3 Place the corner post as close to the headboard as possi ble Fit the button head bolt at the bot...

Страница 29: ...at and horizon tal 2 If the mattress is an alternating air mattress make sure it s fully inflated 3 Place the bar in the highest position 4 Press the small button on the corner post 5 Simultaneously l...

Страница 30: ...The suspension bracket is now placed correctly Electrical parts Mounting the control unit 4 3 Attach the power cord to the control unit 4 Slide the control unit onto the suspension bracket till it cli...

Страница 31: ...s have plugs with yellow O rings these are connected to the yellow control unit colour codes Connecting the control unit The hand control should be connected before the power cable is connected to a m...

Страница 32: ...s be placed where it will be visi ble from the bed and in close proximity to the bed ADDITIONAL ACCESSORIES Additional hand control An additional hand control can be connected if a hand control os req...

Страница 33: ...c parts intact and without signs of wear Are all wires intact Do both bars slacken and tighten the sheet Does the timer activate when the button is pushed twice within 2 seconds Does the timer turn of...

Страница 34: ...the bolts in the mounting plates and turn them aside to lift VENDLET Standard off the bed frame Optionally use the mounting trolley to transport VENDLET Standard to a new destination Storage Store VE...

Страница 35: ...end Check all cables plugs and relief cables for damage Check whether the cables are properly secured Check whether the cables are prop erly secured and not hanging loose Check if the actuators run u...

Страница 36: ...ature Switch the plugs of the two bars If the same bar still does not work then the motor of that bar is defective If the other bar is not working then the hand control or the control unit is defectiv...

Страница 37: ...EU 2017 745 VENDLET Standard is a class I product VENDLET Standard Product no 6300000 Max user weight 250 kg Control unit Power supply SMPS 350W Mains supply 100 220 Volt AC 60 Hz or 100 230 Volt AC...

Страница 38: ...This equipment is compliant with IEC 60601 1 2 meaning that no loss of essential performance is found due to electromag netic disturbances The essential performance of VENDLET Standard refers to cont...

Страница 39: ......

Страница 40: ...All rights reserved Copyright Vendlet ApS Vers 3 0 2021 11 Vendlet ApS Egelund 33 6200 Aabenraa Tel 96 31 00 50 vendlet vendlet dk www vendlet com Manufacturer MD...

Отзывы: