Installation and maintenance instructions auroSTEP plus 0020077748_FT1
4.4
Transport to the installation location
The cylinder is delivered fully assembled.
You have various options for transport to the installa-
tion site.
– Complete in the packaging, if possible at the customer
side
– Without packaging, completely assembled, if the
transport route permits it
– Without casing or insulation, for narrow doorways or
to protect the casing
h
Note!
To remove and refit the casing and insulation
takes 1 person approx. 10 minutes.
h
Note!
The installation can optionally be carried out
with or without the insulation / casing.
h
Note!
If necessary, use the transport aids from the
accessories.
a
Caution!
Damage to the cylinder.
If the cylinder is brought to the installation
location on a trolley or carried there, pay
attention to the insulation on the base of the
cylinder. It must not be damaged.
4.4.1
Transport in the packaging
Fig. 4.3 Transport in the packaging, consisting of top and
bottom styrofoam pads and a cardboard sleeve carton
4.4.2 Transport
without
packaging
2
3
1
Fig. 4.4 Transport without packaging
• Remove the top pad and the cardboard sleeve carton.
• Pull the cylinder (
1
) on the bottom pad (
3
) over the
edge of the pallet until you can break off the bottom
pad at the intended point (
2
) with your foot.
• Position the hand cart in front of the pallet and load
the cylinder on to it.
4.4.3 Transport
without
casing
1
2
3
Fig. 4.5 Removing the top cap and covers