![vacuubrand VACUU-PURE 10 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/vacuubrand/vacuu-pure-10/vacuu-pure-10_instructions-for-use-manual_3265956044.webp)
44
20901220_EN_VACUU·PURE 10_V1.6_060722
Commissioning (operation)
5.2.1
5.2.1 Operation
Operation
Start the vacuum pump
>
Make sure that the outlet is clear and non‑pressurized.
5
The vacuum pump starts. A clicking switch noise can be
heard briefly.
Warm-up (warm-up time)
The operating principle of the vacuum pump is based on gap
seals.
>
The warm‑up time enables the vacuum pump to reach full
operating capacity. When pumping down a 100 l boiler,
the vacuum pump typically reaches the specified ultimate
vacuum after 20 minutes.
VACUU·PURE 10
Warm‑up time (vacuum pump
started)
`
20 minutes
Stop the vacuum pump
5
The vacuum pump stops. A clicking switch noise may be
heard briefly.
Start
Stop
Warm‑up time
Press key
Press key
IMPORTANT!
Содержание VACUU-PURE 10
Страница 1: ...Instructions for use OI no 20901220 Original instructions EN VACUU PURE 10 Vacuum pump...
Страница 12: ...12 20901220_EN_VACUU PURE 10_V1 6_060722 Introduction...
Страница 30: ...30 20901220_EN_VACUU PURE 10_V1 6_060722 Safety information...
Страница 83: ...83 20901220_EN_VACUU PURE 10_V1 6_060722 Appendix 8 7 8 7 CU Certificate CU Certificate CU Certificate...
Страница 84: ...84 20901220_EN_VACUU PURE 10_V1 6_060722...
Страница 85: ...85 20901220_EN_VACUU PURE 10_V1 6_060722...
Страница 86: ...86 20901220_EN_VACUU PURE 10_V1 6_060722...
Страница 87: ...87 20901220_EN_VACUU PURE 10_V1 6_060722...