5.6.2
FRAMES MR8 TO MR9
Table 24: The cable stripping lengths [mm]. See the figure in step 1.
Frame
A
B
C
D
E
F
G
MR8
40
180
25
300
25
300
*
MR9
40
180
25
300
25
300
*
* = As short as possible.
Table 25: The cable stripping lengths [in]. See the figure in step 1.
Frame
A
B
C
D
E
F
G
MR8
1.6
7.1
1
11.8
1
11.8
*
MR9
1.6
7.1
1
11.8
1
11.8
*
* = As short as possible.
1
Strip the motor cable, the mains cable, and the
brake resistor cable.
NOTE!
The Vacon
®
100 FLOW and HVAC software
do not have the dynamic braking or the
brake resistor functions.
B
D
A
C
F
E
G
MAINS
MOTOR
G. The grounding conductor
VACON · 76
POWER CABLING
5
TEL. +358 (0)201 2121 · FAX +358 (0)201 212 205
Содержание 100 flow
Страница 1: ...vacon 100 vacon 100 flow vacon 100 hvac ac drives installation manual wall mounted drives ...
Страница 2: ......
Страница 4: ...VACON 4 TEL 358 0 201 2121 FAX 358 0 201 212 205 ...
Страница 78: ...3 Remove the cable cover M4x8 MR8 M4x8 MR9 VACON 78 POWER CABLING 5 TEL 358 0 201 2121 FAX 358 0 201 212 205 ...