![V-TUF RAPIDSXL110 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/v-tuf/rapidsxl110/rapidsxl110_operators-manual_3088692033.webp)
33
13.1.2 HOT WATER OPERATION
Check that the diesel tank is full (1); if not, fill it up using diesel fuel only
1
• Repeat step 1 and step 2 of cold water operation (previous paragraph).
• Check that the thermostat(tr) is set to 0°C.
• Switch on the burner with the burner switch (br), the corresponding indicator light (b) will light up,
• Wait 30 seconds for the diesel pump to fill up,
• Using the thermostat(tr), turn the knob to the desired temperature (once the required temperature
has been reached, the burner will automatically stop and then switch on again whenever the
temperature drops).
• Act on the gun lever(3) to obtain water delivery from the wand,
• Ensure that this forms a uniform fan (4), exiting the wand and then start work.
At the end of the work:
• Reset the thermostat(tr),
• Keep the gun open (3) and allow the water to cool;
• Act on the burner off switch (br),
• Close the water supply tap (2),
• Act on the switch (in) to deactivate the engine/pump unit
• Actuate the gun lever (3) in order to release the residual pressure.
a (in)
f
b (Br
c
j
d
e
i
3
4
Содержание RAPIDSXL110
Страница 14: ...14 7 6 5 8 9 10 13 14 16 3a...
Страница 49: ...49 THREE PHASE 400V WIRING DIAGRAM ATTACHMENT A ELECTRICAL SYSTEM DIAGRAM...
Страница 50: ...50 WIRING DIAGRAM WITH THREE PHASE 400V RESISTOR BOARD...
Страница 55: ...55...