Installation, Operation and Maintenance Manual
FSF-200-OG, FSF-250-OG, FSF-300-OG,
FSF-500-OG
System Start-up Instructions
1. Once all the plumbing has been connected, open the main water shutoff valve. If the in-
jection panel is used, open both ball valves on the panel.
2. Plug the valve into an approved power source that is constantly energized.
3. When power is supplied to the control valve, the screen will display “INITIALIZING WAIT
PLEASE” while it finds the service position.
4. Once the valve has settled on the time of day, start an Immediate Manual Regeneration
(See page 18). The valve will immediately start moving to the BACKWASH position.
5. Open the inlet on the bypass valve slowly and allow water to enter the unit. Allow all air to
escape from the unit before turning the water on fully then allow water to run to drain for
the entire backwash cycle or until all media fines are washed out of the filter indicated by
clear water coming from the drain hose. The peroxide should be injecting during this pro-
cedure.
6. Press any button to advance to the RINSE position. Check the drain line flow. Allow the
water to run for the entire RINSE cycle until the water is clear.
7. The valve will automatically advance to the SERVICE position after the RINSE cycle is
complete. Open the outlet valve on the control valve bypass, then open the nearest treat-
ed water faucet and allow the water to run until clear, close the tap and replace the faucet
screen.
8. Program time, date, and number of days between regenerations into controller using Pro-
gramming Instructions.