8
2) Lubricate the distributor O-ring and the tank O-ring. Then install the upper basket (the ac-
tual upper basket may look different than the one pictured below) on the bottom of the valve
by lining up the tabs then turning the basket clockwise to lock it in place. Place the upper
basket over the distributor tube and push the valve on the tank. Thread the valve on the tank
by turning it clockwise. Be sure not to cross-thread the valve on the tank. Tighten the valve
hand tight, then snug it further by tapping it with the palm of the hand.
DO NOT
use tools to
tighten the valve or damage could occur.
Installation, Operation and Maintenance Manual
FSF-200-OG, FSF-250-OG, FSF-300-OG,
FSF-500-OG
Tank and Control Valve Preparation