Source NDP Operation and Document Processing
3–2
4326
6295–002
Powering the Unit On and Off
An On/Off switch is located at back of the unit, as shown in Figure 3-1.
Figure 3–1. Power On/Off Switch
Press “|” on the power switch to power on the Source NDP unit. The Power
status light (top indicator) should turn solid green. Refer to Section 6 if a
problem occurs.
Press “O” on the power switch to power off the unit.
When the unit is powered on, status light activity monitors the following start-
up sequence:
1. The Ready indicator (middle indicator) blinks yellow while a connection to
the host PC is established. This normally takes 30 to 40 seconds.
2. The Ready indicator blinks green while the unit waits for a response from
the application at the host PC.
3. The indicator is illuminated solid green when the Source NDP unit is ready
to process documents.
Содержание e-action Source NDP
Страница 7: ...Contents vi 4326 6295 002 ...
Страница 25: ...Source NDP Installation 2 14 4326 6295 002 Figure 2 15 Packing the Source NDP for Shipping ...
Страница 43: ...Source NDP Operation and Document Processing 3 18 4326 6295 002 ...
Страница 79: ...Removal and Replacement of Source NDP Components 5 26 4326 6295 002 ...
Страница 91: ...Recovery from Problem Conditions 6 12 4326 6295 002 ...
Страница 95: ...Source NDP Specifications A 4 4326 6295 002 ...
Страница 97: ...Document Specifications B 2 4326 6295 002 ...
Страница 109: ...Index Index 4 4326 6295 002 ...
Страница 110: ... ...
Страница 111: ... 43266295 002 4 3 2 6 6 2 9 5 0 0 2 ...