6.2
Startup Preparation
45
6
6.2.3 Start-up Preparation Sequence in Other Communication Means
(1) Feed the cooling water into the cooling line.
(2) Turn on the POWER switch and check that the POWER lamp. Under this condition, the
rotor of the turbo molecular pump is levitated by the magnetic bearing.
(3) Online command is demanded from the communication means and confirm the mode was
switched to the communication means mode.
(4) Evacuate the turbo molecular pump by using a backing vacuum pump.
(5) Start-up preparation is complete if the pressure in the turbo molecular pump reduces below
200 Pa.
Содержание UTM1200 Series
Страница 2: ...This page is intentionally left blank...
Страница 10: ...viii Location of Label...
Страница 26: ...12 2 2 4 External I F Panel This page is intentionally left blank...
Страница 27: ...3 3CONSTRUCTION AND PRINCIPLE 3 1 Pump Construction 3 2 Principle of Turbo Molecular Pumping 3 3 Controller...
Страница 32: ...18 3 3 3 Controller This page is intentionally left blank...
Страница 38: ...24 4 4 4 Standards Fulfilled This page is intentionally left blank...
Страница 54: ...40 5 5 5 Notes on Transportation This page is intentionally left blank...
Страница 78: ...64 6 6 8 Communication Specifications This page is intentionally left blank...
Страница 79: ...7 7GAS PURGE...
Страница 88: ...74 8 8 6 Turbo Molecular Pump Return Request This page is intentionally left blank...
Страница 101: ...10 10WARRANTY CLAUSES...
Страница 104: ...90 10 This page is intentionally left blank...
Страница 106: ...Index Index 2 This page is intentionally left blank...