Table of contents
xii
Section 7 GAS PURGE
Section 8 TURBO MOLECULAR PUMP RECONDITION
8.1 Recommended Maintenance Intervals . . . . . . . . . . . . . . . . . . 68
8.2 Turbo Molecular Pump Decontamination . . . . . . . . . . . . . . . . 69
8.3 Touch-down Bearing Replacement . . . . . . . . . . . . . . . . . . . . 69
8.4 Check of the Rotor Blades . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
8.5 Power Supply Unit Parts Replacement . . . . . . . . . . . . . . . . . 70
8.6 Turbo Molecular Pump Return Request . . . . . . . . . . . . . . . . . 71
Section 9 TROUBLESHOOTING
9.1 Vacuum Pressure Rise. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
9.2 Abnormal Noise and/or Vibration . . . . . . . . . . . . . . . . . . . . . . 76
9.3 Nothing Happens After an Operation is Made . . . . . . . . . . . . 77
9.4 Power Failures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
9.4.1
Power Failure Counter-operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
9.5 Alarm Detection Capabilities . . . . . . . . . . . . . . . . . . . . . . . . . 80
9.5.1
Movement in Alarm Detection Capabilities (ALARM) . . . . . . . . . . . . . 80
9.5.2
Movement in Alarm Detection Capabilities (WARNING). . . . . . . . . . . 80
9.5.3
Reset Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Section 10 WARRANTY CLAUSES
○
Warranty Clauses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
○
Warranty Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
○
Duration of Guarantee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
○
Warrantee Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
○
Response Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
○
Disclaimer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
○
Others. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Содержание UTM1200 Series
Страница 2: ...This page is intentionally left blank...
Страница 10: ...viii Location of Label...
Страница 26: ...12 2 2 4 External I F Panel This page is intentionally left blank...
Страница 27: ...3 3CONSTRUCTION AND PRINCIPLE 3 1 Pump Construction 3 2 Principle of Turbo Molecular Pumping 3 3 Controller...
Страница 32: ...18 3 3 3 Controller This page is intentionally left blank...
Страница 38: ...24 4 4 4 Standards Fulfilled This page is intentionally left blank...
Страница 54: ...40 5 5 5 Notes on Transportation This page is intentionally left blank...
Страница 78: ...64 6 6 8 Communication Specifications This page is intentionally left blank...
Страница 79: ...7 7GAS PURGE...
Страница 88: ...74 8 8 6 Turbo Molecular Pump Return Request This page is intentionally left blank...
Страница 101: ...10 10WARRANTY CLAUSES...
Страница 104: ...90 10 This page is intentionally left blank...
Страница 106: ...Index Index 2 This page is intentionally left blank...