![ULTRAFRYER Systems PAR-3-HE Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/ultrafryer-systems/par-3-he/par-3-he_operating-instructions-manual_3471597046.webp)
30A135
B. POLISHING SHORTENING
1 Set a timer for the amount of time established for
POLISHING
shortening, then turn the
VAT SHORTENING RETURN
LEVER
1/4 TURN COUNTER CLOCKWISE
to allow shortening to circulate through the system to
POLISH
the shortening.
CAUTION: DO NOT POLISH THE SHORTENING MORE THAN THE ESTABLISHED TIME AS IT WILL PUMP
EXCESS AIR INTO THE SHORTENING CAUSING SHORTENING BREAKDOWN.
2. At the end of the established time,
TURN
the
VAT SHORTENING
RETURN LEVER
1/4 TURN CLOCKWISE
, turn the
DRAIN VALVE HANDLE
to the closed
UP
position; replace the grill in the fryer; then
TURN
the Vat Shortening
RETURN
LEVER
1/4 COUNTER CLOCKWISE
to automaticlly return shortening in the filter tub to the fryer vat.
3. When all shortening in the filter tub has been returned to the fryer,
TURN
the
VAT SHORTENING
RETURN LEVER
,
1/4
TURN CLOCKWISE
check and if necessary add fresh shortening so shortening is level with the middle line of the letter
“E”
in the word
LEVEL
of the shortening level mark on the rear wall of the fryer.
4. Remove the Filter Tub Assembly by pressing the
DOCKING RELEASE HANDLE
and pulling the
STANDPIPE DOCKING
HANDLE ASSY
away from the
FEMALE
Bulkhead Socket adjacent to the Drain Valve; then
THOROUGHLY
clean,
assemble and replace the Filter Tub Assembly in the fryer cabinet.
SHORTENING DISPOSAL, BOIL-OUT& SHORTENING INSTALLATION
A. GENERAL -T
he Model PAR-3-HE Gas Fryer should be
BOILED-OUT
every
7 DAYS
to remove carbon buildup and other
encrusted material.
B. SHORTENING DISPOSAL
1.
CAREFULLY
assemble the Filter Tub assembly according to paragraph A page 38 and
CAREFULLY
install it in the fryer
cabinet according to paragraph B page 38.
CAUTION: PRIOR TO PROCEEDING TO THE NEXT STEP, PUT ON SAFETY GOGGLES, NEOPRENE INSULATED GLOVES
AND AN APRON.
2. Turn the Toggle ON/OFF switch and Manual Gas Valve
OFF,
and ensure the filter tub is properly
DOCKED
beneath the
fryer drain valve.
NOTE:
Pull on the filter tub to
ASSURE
the male docking plug is
SEATED
in the female bulkhead socket.
3. Attach the Drain Valve Handle to the drain valve; then open the drain valve by turning the
DRAIN VALVE HANDLE
slightly downward. When the bottom of the filter tub is covered with about two (2) inches of shortening, completely
OPEN
the drain valve, and while shortening is draining, scrape all sides of the vat to remove encrusted material using a
scraper.
4. When all shortening has drained into the filter tub, use the
DRAIN ROD
to place the wire rack on one side of the vat.
5. Use the drain rod to pull sediment on the bottom of the vat towards the drain valve opening and push it through the valve
opening.
6. Use one (1) of the following procedures to
FLUSH
sediment and debris from the fryer vat:
a. Fryer
WITHOUT
an Automatic Vat Cleaner:
1)
CAREFULLY
connect the Wash Down Hose
MALE
In-Line Plug to the
TOPSIDE FEMALE SOCKET
and place the
Wash Down Hose into the vat and hold it firmly against an inner wall so it will not “recoil” upward when the pump
comes
ON.
2)
TURN
the Topside Shortening Return Lever 1/4 turn counter clockwise and hold the wand hose nozzle at a 45º
angle from the bottom of the fryer causing sediment and debris to bounce off the rear wall of the vat and flow
towards the drain valve.
3) Use the “L” shaped vat brush to push the sediment through the drain valve to keep the drain clear. Hose off the
burner tubes and all walls of the vat until all the sediment and residue at the bottom of the fryer has been flushed
through the drain into the filter tub. Then turn theTopside Shortening Return Lever 1/4 turn clockwise.
b. Fryer
WITH
an Automatic Vat Cleaner (AVC):
1)
CAREFULLY
position the
AVC (SPRAY BLASTER)
on the fryer and
SECURELY
connect the
MALE
In-Line Plug
on the Spray Blaster flexible hose to the
TOPSIDE FEMALE SOCKET.
2)
TURN
the Topside Shortening
RETURN EVER 1/4 TURN COUNTER CLOCKWISE
to allow shortening in the
filter tub to be discharged in the vat through the four (4) nozzles in the bottom of the Spray Blaster flushing sedi-
ment and debris through the drain valve.
Page 42 of 61
Содержание PAR-3-HE
Страница 5: ...30A135 GENERAL INFORMATION Page 1 of 61...
Страница 11: ...30A135 PRE INSTALLATION Page 7 of 61...
Страница 13: ...30A135 RECEIVING INSTALLING Page 9 of 61...
Страница 18: ...30A135 INITIAL START UP Page 14 of 61...
Страница 22: ...30A135 OPERATING INSTRUCTIONS Page 18 of 61...
Страница 24: ...30A135 MAINTENANCE ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 61...
Страница 26: ...30A135 PREVENTITIVE MAINTENANCE TROUBLESHOOTING Page 22 of 61...
Страница 29: ...30A135 RECOMMENDED SPARE PARTS Page 25 of 61...
Страница 31: ...30A135 CLEANING Page 27 of 62...
Страница 36: ...30A135 FRYER OPERATION Page 32 of 61...
Страница 41: ...30A135 FILTER TUB ASSEMBLY INSTALLATION Page 37 of 61...
Страница 43: ...30A135 FILTERING POLISHING SHORTENING Page 39 of 61...
Страница 48: ...30A135 SHORTENING DISPOSAL BOIL OUT INSTALLATION Page 44 of 61...
Страница 52: ...30A135 TECHNICAL ASSISTANCE ORDERING INFORMATION PARTS IDENTIFICATION Page 48 of 61...
Страница 54: ...30A135 ULTRAFRYER MODEL PAR 3 HE GAS FRYER FRONT VIEW Page 50 of 61 18 PAR 3 HE...
Страница 61: ...30A135 WIRING DIAGRAMS Page 57 of 61...
Страница 63: ...30A135 PAR 3 HE GAS FRYER W COMPUTER Page 59 of 61...
Страница 64: ...30A135 PAR 3 HE GAS FRYER W COMPUTER BASKET LIFT Page 61 of 62...
Страница 65: ...30A135 THIS PAGE INTENTIONALLY LEFT BLANK Page 61 of 61...