30A135
RECEIVING & INSTALLING THE FRYER
A. UNPACKING:
Check that the container is upright. Use an outward prying motion –
DO NOT USE A HAMMER
- to remove the
carton. Check the fryer for visible damage; if such damage has occurred do not refuse shipment, but contact the carrier and file the
appropriate freight claims.
B. INSTALLING:
Roll the assembled fryer into the building, to it’s operating location.
WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE
PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE
INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
C. LEVELING:
1. When the fryer is placed in its operating location check to be sure it is level. If not, loosen the casters and insert the appropri
ate number of shim plates between leg and caster plates then retighten the caster bolts.
2. If the floor is smooth and level, adjust to the high corner and measure with a spirit level. If the floor is uneven or has a
decided slope, level the unit with metal shims.
NOTE:
A caster may not return exactly to the same position after being moved, which may require re-leveling after each move.
3. Connect the gas manifold to the building gas supply line by means of a CSA International APPROVED flexible gas line as
shown in the figure below.
NOTE:
CONNECT-IT inc. 3⁄4” (19mm), 1” (25mm) and 1 1⁄4” (32mm) flexible gas hose 4 feet long (1219mm) with a quick
disconnect coupling
WARNING: THE RESTRAINT DEVICE (ITEM 9) MUST BE INSTALLED TO ASSURE TENSION CANNOT BE PLACED ON THE FLEXIBLE
GAS LINE OR FITTING.
1. BUILDING GAS SERVICE LINE
6. APPLIANCE MANIFOLD/NIPPLE
2. MAIN GAS CUT-OFF VALVE
7. EYELET FASTENERS
3. CONNECT-IT QUICK-DISCONNECT
8. SPRING HOOK
4. FLEX-CON CONNECTOR
9. RESTRAINING CHAIN
5. ELBOW
TYPICAL GAS CONNECTION
Page 10 of 61
Содержание PAR-3-HE
Страница 5: ...30A135 GENERAL INFORMATION Page 1 of 61...
Страница 11: ...30A135 PRE INSTALLATION Page 7 of 61...
Страница 13: ...30A135 RECEIVING INSTALLING Page 9 of 61...
Страница 18: ...30A135 INITIAL START UP Page 14 of 61...
Страница 22: ...30A135 OPERATING INSTRUCTIONS Page 18 of 61...
Страница 24: ...30A135 MAINTENANCE ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 61...
Страница 26: ...30A135 PREVENTITIVE MAINTENANCE TROUBLESHOOTING Page 22 of 61...
Страница 29: ...30A135 RECOMMENDED SPARE PARTS Page 25 of 61...
Страница 31: ...30A135 CLEANING Page 27 of 62...
Страница 36: ...30A135 FRYER OPERATION Page 32 of 61...
Страница 41: ...30A135 FILTER TUB ASSEMBLY INSTALLATION Page 37 of 61...
Страница 43: ...30A135 FILTERING POLISHING SHORTENING Page 39 of 61...
Страница 48: ...30A135 SHORTENING DISPOSAL BOIL OUT INSTALLATION Page 44 of 61...
Страница 52: ...30A135 TECHNICAL ASSISTANCE ORDERING INFORMATION PARTS IDENTIFICATION Page 48 of 61...
Страница 54: ...30A135 ULTRAFRYER MODEL PAR 3 HE GAS FRYER FRONT VIEW Page 50 of 61 18 PAR 3 HE...
Страница 61: ...30A135 WIRING DIAGRAMS Page 57 of 61...
Страница 63: ...30A135 PAR 3 HE GAS FRYER W COMPUTER Page 59 of 61...
Страница 64: ...30A135 PAR 3 HE GAS FRYER W COMPUTER BASKET LIFT Page 61 of 62...
Страница 65: ...30A135 THIS PAGE INTENTIONALLY LEFT BLANK Page 61 of 61...