ULB PROPRIETARY RIGHTS NOTICE
- This document contains the confidential and proprietary information of ULB. You may not possess,
use, copy or disclose this document or any information in it for any purpose without express written permission. Neither receipt from any source,
nor possession of this document, constitutes such permission. Possession, use, copying or disclosure by anyone without express written
permission of ULB is not authorized and may result in criminal and/or civil liability.
U:\ILB\5_Technical Manual\TLB-R1000-480-OS_NO ALL\TLB-R1000_480_MANUAL_Rev03.docx
Page
28
of
35
MAINTENANCE
Click <MAINT. SCREEN> button on main screen to display various software setting applicable to this
load bank.
WARNING
Stop Load Test before entering in to this set up screen. Setting should be changed by only qualified
person who clearly understands implication of changing each setting.
A pop up window will ask user to enter password. Upon correct password entry following Set up /
Maintenance screen will appear (See Fig.12)
Fig.12 Set up/Maintenance
On this screen following settings can be done,
1) Fan Run Time after Load Drop (Seconds): Typically 300 Seconds ( 5 Minutes )
2) HMI Setting: Click on this button to change various settings as per HMI Display manufacturer
manual.
3) HMI Date/Time: Set date / time to current date / time.
4) Brightness: Adjusts brightness of display screen.
This screen also shows Load Bank running hours based on run time of blower motor since last reset.
In case of major maintenance or replacement of blower motor, run hours can be reset to zero by
pressing <RESET> button.