OPERATOR’S MANUAL
184 / SYSTEM TEST
ISO
6
Version 4 UL 2_3 Manual
6011258 Rev C
SYSTEM TEST
CONTINUOUS TEST
Performing a continuous test runs the control while stationary for
troubleshooting or maintenance purposes. The values entered
will not affect any other setup values that have previously
been entered.
NOTE
A remote test switch is recommended to perform this test.
TO RUN A CONTINUOUS TEST:
1. At the Home Menu, press the
CONTROLS
button.
2. At the Controls screen, select the appropriate channel.
3. Press the
EDIT
button.
4. Press the
CONTINUOUS TEST
button.
5. Enter values to perform a continuous test for
-
Test Ground Speed
-
Row
6. Press the
START
button.
7. Press and hold remote test switch until the test is complete.
8. Release test switch and the control will stop.
9. Press the test switch again to clear the seed count and
restart the control.
10. Steps 4-6 will repeat until the Stop button is pressed.
Figure 145
Continuous Test
TEST GROUND SPEED
Desired ground speed reference to perform the test.
Содержание DICKEY-john INTELLIAG ISO6
Страница 111: ...OPERATOR S MANUAL 106 SECTION CONTROL ISO6 Version 4 UL 2_3 Manual 6011258 Rev C Figure 71 Assigning Clutch Sections ...
Страница 115: ...OPERATOR S MANUAL 110 SECTION LINKING ISO6 Version 4 UL 2_3 Manual 6011258 Rev C Figure 74 Linking Sections ...
Страница 197: ...OPERATOR S MANUAL 192 VERSION INFORMATION ISO6 Version 4 UL 2_3 Manual 6012487 Rev A ...
Страница 205: ...OPERATOR S MANUAL 200 DIAGNOSTICS ISO6 Version 4 UL 2_3 Manual 6011258 Rev C Figure 154 Manual Open of a Channel ...