OPERATOR’S MANUAL
ISO
6
Version 4 UL 2_3 Manual
LIQUID BOOM SECTION CONTROL / 107
6011258 Rev C
LIQUID BOOM SECTION CONTROL
For liquid pressure applications using boom control, a module’s
position, number of outputs, and boom assignment must
be defined.
Controlling sections require:
Boom Output Module
Boom Switch Modules (optional)
BOOM SETUP
The Boom Setup screen identifies how many boom output
modules are connected to the system and allows assignment of
boom outputs and boom sections to each module.
TO ASSIGN BOOM OUTPUT MODULES:
1. Press the
LIQUID SECTIONS
button.
2. Enter total number of sections.
3. Enter number of nozzles assigned to each module in the
# OF OUTPUTS input box.
Figure 72
Boom Setup
Содержание DICKEY-john INTELLIAG ISO6
Страница 111: ...OPERATOR S MANUAL 106 SECTION CONTROL ISO6 Version 4 UL 2_3 Manual 6011258 Rev C Figure 71 Assigning Clutch Sections ...
Страница 115: ...OPERATOR S MANUAL 110 SECTION LINKING ISO6 Version 4 UL 2_3 Manual 6011258 Rev C Figure 74 Linking Sections ...
Страница 197: ...OPERATOR S MANUAL 192 VERSION INFORMATION ISO6 Version 4 UL 2_3 Manual 6012487 Rev A ...
Страница 205: ...OPERATOR S MANUAL 200 DIAGNOSTICS ISO6 Version 4 UL 2_3 Manual 6011258 Rev C Figure 154 Manual Open of a Channel ...