6.
Transport
Transport of the system from the truck to its final installation site
needs to be prepared and carried out. TRUMPF delivers the
machine free to the purchaser's address. The customer is
responsible to transport the machine to the installation site.
6.1
Preparing transport
Before the machine is delivered, check the following:
■
Is there sufficient space for transport to the installation site?
■
Can the floor can be crossed with armored rollers, etc.?
■
Are the gateway openings, header heights and cable rack
heights sufficient?
TruArc Weld 1000
Dimensions
Weight of machine
2980 kg (6569.8 lbs)
Length
3605 mm (142 in)
Width
2454 mm (97 in)
Height of the machine
2818 mm (111 in)
Transport dimensions
Tab. 2-16
6.2
Permitted auxiliary tools
Note
The carrying capacity of the authorized auxiliary equipment must
be selected in such a way that the maximum load can be trans-
ported safely.
Authorized additional equipment
Carrying capacity
Unloading the
machine from the truck
Crane truck. Slinging equipment:
■
Adjustable crane chain
■
2 shackles, form A (DIN 82101)
According to the machine weight
or
Forklift truck
3 t
B1154en
Transport - Version 2
2
‐
17