![Travis Industries 21 TRV GreenSmart Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/travis-industries/21-trv-greensmart/21-trv-greensmart_installation-manual_1153983038.webp)
3 8
Installation
(for qualified installers only)
© Travis Industries
4080207
100-01185_000
Mantel Requirements
•
The illustration below details mantel clearances and maximum mantel depth.
•
Any material that protrudes more than 3/4” from the non-combustible facing is considered a mantel
and must meet the mantel requirements.
a
b
If you have a tapered mantel, measure the
mantel height at the point where it
protrudes 3/4” in front of the face.
Maximum Mantel Depth (b)
Mantel
Height
Above
Face (a)
0”
1”
2”
8”
7”
6”
5”
4”
3”
9”
0” 1” 2” 3” 4” 5” 6” 7” 8” 9” 10” 11” 12”
See “Face Dimensions”
Combustible mantel columns (legs) that
protrude more than 3/4” from the glass
frame must meet the sidewall clearance (1”
from the face). If they protrude 3/4” or less,
they do not have a minimum clearance.
Non-combustible mantel columns do not
have a minimum clearance.
Mantel
(combustible or non-combustible)