Installation
(for qualified installers only)
1 7
© Travis Industries
4080207
100-01185_000
Nailing Brackets
For installations using 1”
facing (1/2” drywall with
3/8” tile, 7/8” tile, etc.)
fold the upper tab out
90°.
For installations using
1/2” facing (1/2” drywall
or other facing) fold the
lower tab out 90°.
AAAAAAAAAA
AAAAAAAA
Fireplace
Drywall
Framing
Nailing Bracket
TOP VIEW
Tile
AA AAAAAAAA
AAAAAAAA
Fireplace
Drywall
AAAAAA
Framing
Nailing Bracket
TOP VIEW
1/2” Facing
7/8” to 1” Facing
There are four nailing brackets on
the sides of the fireplace. Follow
the directions below to prepare the
nailing brackets. Once in place,
nail or screw the nailing brackets to
the framing.
NOTE: There are alternative
nailing brackets on the back
corners of the fireplace if the
front brackets can not be used.
7/8”