Installation — Remote Evaporator
Oil Charge Determination
The unit is factory charged with the amount of oil required by the system,
without the field-installed piping. The amount of additional oil required is
dependent upon the amount of refrigerant that is added to the system for the
field-installed piping.
Use the following formula to calculate the amount of oil to be added:
Pints of Oil (Trane Oil-31) =
lbs of refrigerant added for field-installed piping
100
From the example above, in which the weight of the additional refrigerant
added for the field-installed piping was 34.0 lbs (30.6 + 3.4), the amount of oil
to be added equals 0.34 pints (34.0/100) per circuit.
Example: Refrigerant Charge Computation
Determine the approximate amount of charge required for an RTAA 100 ton
unit with a remote evaporator that is located 75 feet away (i.e the actual
length of field-installed pipe is 75 feet for each suction line and liquid line).
Assume that the suction lines have been previously determined to be in.,
O.D. and the liquid lines are in. 1-1/8 O.D.
Relief Valve Venting
All relief valve venting is the responsibility of the installing contractor.
The remote evaporators on chillers sold with this option utilize relief valves
installed in each circuit of the evaporator head. There is one relief valve per
circuit, and they must be vented to the outside of the building.
1.
From Table 2g for a 50 ton
circuit requires:
= 73 lbs. R-22
2.
From Table 2h for a 2-518
inch OD suction line:
75 feet x 4.5 feet
= 3.4 lbs. R-22
3.
From Table 2h for a 1 118
inch OD liquid line:
75 feet x 40.8 feet
= 30.6 Ibs. R-22
4.
Total R-22 charge per circuit:
Sum results of steps
1,2, and 3
= 107 Ibs. R-22 per circuit
5.
Total R-22 charge per machine:
2 circuits x 107 Ibs.
= 214 Ibs. R-22 per machine
Table 9
Field-Installed Piping Charge
Lbs. R-22 per 100 ft.
Pipe O.D.
(inches)
Suction Line Liquid Line
1-1/8
0.78
40.8
1-3/8
1.2
62.2
1-5/8
1.7
88
2-1/8
2.9
153.1
2-5/8
4.5
236.1
3-1/8
6.4
—
Содержание RTAA-100
Страница 12: ...12 RTAA SVX01A EN Installation Mechanical Figure 4 RTAA Rigging and Lifting Weights Packaged Unit...
Страница 13: ...RTAA SVX01A EN 13 Installation Mechanical Figure 5 RTAA Rigging and Lifting Weights Remote Evaporator...
Страница 14: ...14 RTAA SVX01A EN Installation Mechanical Figure 6 RTAA Rigging and Lifting Weights Pump Package Aluminum Fins...
Страница 15: ...RTAA SVX01A EN 15 Installation Mechanical Figure 7 RTAA Rigging and Lifting Weights Pump Package Copper Fins...
Страница 18: ...18 RTAA SVX01A EN Installation Mechanical Figure 8 Dimensions and Clearances for RTAA Packaged Unit 70 125 Tons...
Страница 20: ...20 RTAA SVX01A EN Installation Mechanical Figure 10 Remote Evaporator Dimensions RTAA 70 125 Tons...
Страница 21: ...RTAA SVX01A EN 21 Installation Mechanical Figure 11 Remote Evaporator Dimensions RTAA 110 125 Tons...
Страница 25: ...RTAA SVX01A EN 25 Installation Mechanical Figure 14 Isolator Placement for RTAA with Remote Evaporator...
Страница 45: ...RTAA SVX01A EN 45 Installation Remote Evaporator Figure 24 Refrigerant Sensor Mounting and Wiring...
Страница 65: ...RTAA SVX01A EN 65 Installation Electrical Figure 31 Remote Display Panel Interconnecting Wiring...
Страница 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Страница 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Страница 144: ...144 RTAA SVX01A EN Pump Package...
Страница 146: ...146 RTAA SVX01A EN 3327...
Страница 147: ...RTAA SVX01A EN 147...
Страница 148: ...148 RTAA SVX01A EN 3328...
Страница 149: ...RTAA SVX01A EN 149...
Страница 150: ...150 RTAA SVX01A EN 6516...
Страница 151: ...RTAA SVX01A EN 151...
Страница 152: ...152 RTAA SVX01A EN 3329...
Страница 153: ...RTAA SVX01A EN 153...
Страница 154: ...154 RTAA SVX01A EN 6472...
Страница 155: ...RTAA SVX01A EN 155...
Страница 156: ...RTAA SVX01A EN 156 3330...
Страница 157: ...157 RTAA SVX01A EN...
Страница 158: ...158 RTAA SVX01A EN 6046...
Страница 159: ...RTAA SVX01A EN 159...
Страница 160: ...160 RTAA SVX01A EN 3331...
Страница 161: ...RTAA SVX01A EN 161...
Страница 162: ...162 RTAA SVX01A EN 6519...
Страница 163: ...RTAA SVX01A EN 163...
Страница 164: ...164 RTAA SVX01A EN 6047...
Страница 165: ...RTAA SVX01A EN 165...
Страница 166: ...166 RTAA SVX01A EN 3325...
Страница 167: ...RTAA SVX01A EN 167...
Страница 168: ...168 RTAA SVX01A EN 6048...
Страница 169: ...RTAA SVX01A EN 169...
Страница 172: ...172 RTAA SVX01A EN 3326...
Страница 173: ...RTAA SVX01A EN 173...
Страница 174: ...174 RTAA SVX01A EN 6049...
Страница 175: ...RTAA SVX01A EN 175...
Страница 176: ...176 RTAA SVX01A EN 6463...
Страница 177: ......