Power Supply Wiring
All power supply wiring must be sized and selected accordingly by the project
engineer in accordance with the National Electrical Code.
All wiring must comply with local codes and the National Electrical Code. The
installing (or electrical) contractor must provide and install the system inter-
connecting wiring, as well as the power supply wiring. It must be properly
sized and equipped with the appropriate branch circuit protection. The type
and installation location(s) must comply with all applicable codes.
Cut holes for the appropriately-sized wiring conduits in the lower right side of
the power connection panel. The wiring is passed through these conduits and
connected to the terminal blocks or optional unit-mounted disconnect or
circuit breaker.
To provide proper phasing of 3-phase input, make connections as shown in
the Field Wiring diagrams and as stated on the yellow WARNING label in the
starter panel. For additional information on proper phasing, refer to “Unit
Voltage Phasing”. Proper equipment ground must be provided to each ground
connection in the panel.
Control Power Supply
The unit is equipped with the control power transformer. It is not necessary
to provide control power voltage to the unit.
Heat Tape Power Supply (Packaged Units Only)
NOTE:
Units with the Remote Evaporator option do not have heat tape.
The evaporator shell is insulated from ambient air and protected from freezing
temperatures by a thermostatically-controlled heat tape. Whenever the
chilled water temperature drops to approximately 37 F, the thermostat
energizes the heat tape. The heat tape will protect the evaporator from
ambient temperatures down to -20 F
Provide an independent power source (115V, 15 amp), with a fuse disconnect.
The heat tape is factory wired back to the unit control panel. Customer
connections are made on terminal strip 1TB3, terminals 16 and 17.
Water Pump Power Supply
Provide power supply wiring with fused-disconnect for the chilled water
pump(s) unless unit is equipped with optional pump package.
Interlock Wiring
CAUTION
Evaporator Damage!
The chiller water pump must operate for a minimum of one
minute after the UCM receives a command through the external
Auto/Stop input to shut down the chilled water system. Do not
use the proof of chiller water flow interlock (1U1 TB3-1 and -2) by
itself as the normal means of terminating chiller operation. Failure
to continue pump operation for one minute after unit shut down
may result in evaporator freeze up.
Normally, when the compressors are terminating a cycle (when chiller Stop
key, loss of load, low ambient run inhibit, or external Auto/Stop), the controller
will initiate the “Run: UNLOAD” mode. This operating mode commands the
compressors to their complete unloaded position, which takes about 1/2
Содержание RTAA-100
Страница 12: ...12 RTAA SVX01A EN Installation Mechanical Figure 4 RTAA Rigging and Lifting Weights Packaged Unit...
Страница 13: ...RTAA SVX01A EN 13 Installation Mechanical Figure 5 RTAA Rigging and Lifting Weights Remote Evaporator...
Страница 14: ...14 RTAA SVX01A EN Installation Mechanical Figure 6 RTAA Rigging and Lifting Weights Pump Package Aluminum Fins...
Страница 15: ...RTAA SVX01A EN 15 Installation Mechanical Figure 7 RTAA Rigging and Lifting Weights Pump Package Copper Fins...
Страница 18: ...18 RTAA SVX01A EN Installation Mechanical Figure 8 Dimensions and Clearances for RTAA Packaged Unit 70 125 Tons...
Страница 20: ...20 RTAA SVX01A EN Installation Mechanical Figure 10 Remote Evaporator Dimensions RTAA 70 125 Tons...
Страница 21: ...RTAA SVX01A EN 21 Installation Mechanical Figure 11 Remote Evaporator Dimensions RTAA 110 125 Tons...
Страница 25: ...RTAA SVX01A EN 25 Installation Mechanical Figure 14 Isolator Placement for RTAA with Remote Evaporator...
Страница 45: ...RTAA SVX01A EN 45 Installation Remote Evaporator Figure 24 Refrigerant Sensor Mounting and Wiring...
Страница 65: ...RTAA SVX01A EN 65 Installation Electrical Figure 31 Remote Display Panel Interconnecting Wiring...
Страница 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Страница 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Страница 144: ...144 RTAA SVX01A EN Pump Package...
Страница 146: ...146 RTAA SVX01A EN 3327...
Страница 147: ...RTAA SVX01A EN 147...
Страница 148: ...148 RTAA SVX01A EN 3328...
Страница 149: ...RTAA SVX01A EN 149...
Страница 150: ...150 RTAA SVX01A EN 6516...
Страница 151: ...RTAA SVX01A EN 151...
Страница 152: ...152 RTAA SVX01A EN 3329...
Страница 153: ...RTAA SVX01A EN 153...
Страница 154: ...154 RTAA SVX01A EN 6472...
Страница 155: ...RTAA SVX01A EN 155...
Страница 156: ...RTAA SVX01A EN 156 3330...
Страница 157: ...157 RTAA SVX01A EN...
Страница 158: ...158 RTAA SVX01A EN 6046...
Страница 159: ...RTAA SVX01A EN 159...
Страница 160: ...160 RTAA SVX01A EN 3331...
Страница 161: ...RTAA SVX01A EN 161...
Страница 162: ...162 RTAA SVX01A EN 6519...
Страница 163: ...RTAA SVX01A EN 163...
Страница 164: ...164 RTAA SVX01A EN 6047...
Страница 165: ...RTAA SVX01A EN 165...
Страница 166: ...166 RTAA SVX01A EN 3325...
Страница 167: ...RTAA SVX01A EN 167...
Страница 168: ...168 RTAA SVX01A EN 6048...
Страница 169: ...RTAA SVX01A EN 169...
Страница 172: ...172 RTAA SVX01A EN 3326...
Страница 173: ...RTAA SVX01A EN 173...
Страница 174: ...174 RTAA SVX01A EN 6049...
Страница 175: ...RTAA SVX01A EN 175...
Страница 176: ...176 RTAA SVX01A EN 6463...
Страница 177: ......