108
RTAA-SVX01A-EN
Start-Up Procedures
If the pre-start checkout, as discussed above, has been completed, the unit is
ready to start. The Clear Language Display is shown in
Figure 35
and Clear
Language Display Sequence of Operation is shown in
Figure 1
. Complete
each step, in sequence, as follows:
•
Press the Stop key on the Clear Language Display.
•
As necessary, adjust the setpoint values in the Clear Language Display
menus, as describe in “Clear Language Display Key Pad Overview”.
•
Close the fused-disconnect switch for the chilled water pump. Energize
the pump to start chilled water circulation.
•
Check the service valves on the discharge line, suction line, oil line and
liquid line for each circuit. These valves must be open (backseated) before
starting the compressors.
CAUTION
Compressor Damage!
To prevent compressor damage, do not operate the unit until all
refrigerant and oil line service valves are opened.
•
Energize the compressor sump heaters, if not already energized. Also
close the unit-mounted disconnect, if used.
CAUTION
Compressor Damage!
The compressor sump heaters must be energized for a minimum
of 24 hours prior to unit operation, to prevent compressor
damage caused by liquid refrigerant in the compressor at
start-up.
•
Verify that the evaporator heat tape is energized.
•
Verify that the chilled water pump runs for one minute after the chiller is
commanded to stop (for normal chilled water systems). See Interlock
Wiring.
•
Press the Auto key. If the chiller control calls for cooling and all safety
interlocks are closed, the unit will start. The compressor(s) will load and
unload in response to the temperature of the leaving chilled water tem-
perature.
If optional low-ambient lockout is used, outside air temperature must be
above the minimum starting ambients, as shown in
Table 1
, for continued unit
operation. Also refer to the wiring diagrams.
Once the system has been operating for approximately 30 minutes and has
become stabilized, complete the start-up procedures, as follows:
•
Check the evaporator refrigerant pressure and the condenser refrigerant
pressure under Refrigerant Report on the Clear Language Display. The
pressures are referenced to sea level (14.6960 psia).
•
Check the liquid line sight glasses. The refrigerant flow past the sight
glasses should be clear. Bubbles in the refrigerant indicate either low
Содержание RTAA-100
Страница 12: ...12 RTAA SVX01A EN Installation Mechanical Figure 4 RTAA Rigging and Lifting Weights Packaged Unit...
Страница 13: ...RTAA SVX01A EN 13 Installation Mechanical Figure 5 RTAA Rigging and Lifting Weights Remote Evaporator...
Страница 14: ...14 RTAA SVX01A EN Installation Mechanical Figure 6 RTAA Rigging and Lifting Weights Pump Package Aluminum Fins...
Страница 15: ...RTAA SVX01A EN 15 Installation Mechanical Figure 7 RTAA Rigging and Lifting Weights Pump Package Copper Fins...
Страница 18: ...18 RTAA SVX01A EN Installation Mechanical Figure 8 Dimensions and Clearances for RTAA Packaged Unit 70 125 Tons...
Страница 20: ...20 RTAA SVX01A EN Installation Mechanical Figure 10 Remote Evaporator Dimensions RTAA 70 125 Tons...
Страница 21: ...RTAA SVX01A EN 21 Installation Mechanical Figure 11 Remote Evaporator Dimensions RTAA 110 125 Tons...
Страница 25: ...RTAA SVX01A EN 25 Installation Mechanical Figure 14 Isolator Placement for RTAA with Remote Evaporator...
Страница 45: ...RTAA SVX01A EN 45 Installation Remote Evaporator Figure 24 Refrigerant Sensor Mounting and Wiring...
Страница 65: ...RTAA SVX01A EN 65 Installation Electrical Figure 31 Remote Display Panel Interconnecting Wiring...
Страница 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Страница 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Страница 144: ...144 RTAA SVX01A EN Pump Package...
Страница 146: ...146 RTAA SVX01A EN 3327...
Страница 147: ...RTAA SVX01A EN 147...
Страница 148: ...148 RTAA SVX01A EN 3328...
Страница 149: ...RTAA SVX01A EN 149...
Страница 150: ...150 RTAA SVX01A EN 6516...
Страница 151: ...RTAA SVX01A EN 151...
Страница 152: ...152 RTAA SVX01A EN 3329...
Страница 153: ...RTAA SVX01A EN 153...
Страница 154: ...154 RTAA SVX01A EN 6472...
Страница 155: ...RTAA SVX01A EN 155...
Страница 156: ...RTAA SVX01A EN 156 3330...
Страница 157: ...157 RTAA SVX01A EN...
Страница 158: ...158 RTAA SVX01A EN 6046...
Страница 159: ...RTAA SVX01A EN 159...
Страница 160: ...160 RTAA SVX01A EN 3331...
Страница 161: ...RTAA SVX01A EN 161...
Страница 162: ...162 RTAA SVX01A EN 6519...
Страница 163: ...RTAA SVX01A EN 163...
Страница 164: ...164 RTAA SVX01A EN 6047...
Страница 165: ...RTAA SVX01A EN 165...
Страница 166: ...166 RTAA SVX01A EN 3325...
Страница 167: ...RTAA SVX01A EN 167...
Страница 168: ...168 RTAA SVX01A EN 6048...
Страница 169: ...RTAA SVX01A EN 169...
Страница 172: ...172 RTAA SVX01A EN 3326...
Страница 173: ...RTAA SVX01A EN 173...
Страница 174: ...174 RTAA SVX01A EN 6049...
Страница 175: ...RTAA SVX01A EN 175...
Страница 176: ...176 RTAA SVX01A EN 6463...
Страница 177: ......