Generally, the contractor must do the following when installing an RTAA unit:
•
Install unit on a flat foundation, level (within 1/4” [6 mm] across the
length and width of the unit), and strong enough to support unit loading.
•
Install unit per the instructions contained in the Installation-Mechanical
and Installation-Electrical sections of this manual.
•
Where specified, provide and install valves in water piping upstream and
downstream of evaporator water connections to isolate the evaporator
for maintenance, and to balance/trim system.
•
Furnish and install flow switch to prove chilled water flow.
•
Furnish and install pressure gauges in inlet and outlet piping of the evapo-
rator.
•
Furnish and install a drain valve to the bottom of the evaporator.
•
Supply and install a vent cock to the top of the evaporator.
•
Furnish and install strainers ahead of all pumps and automatic modulating
valves.
•
Provide and install field wiring.
•
Install heat tape and insulate the chilled water lines and any other por-
tions of the system, as required, to prevent sweating under normal oper-
ating conditions or freezing during low ambient temperature conditions.
•
Start unit under supervision of a qualified service technician.
For remote evaporator units only
Furnish and install refrigerant piping, liquid line isolation valves, refrigerant,
and oil, per instructions outlined in this manual.
Storage
Extended storage of the outdoor unit prior to installation requires the
following precautionary measures:
Store the outdoor unit in a secure area.
At least every three months (quarterly), check the pressure in the refrigerant
circuits to verify that the refrigerant charge is intact. If it is not, contact a
qualified service organization and the appropriate Trane sales office.
Close the discharge and liquid line isolation valves.
Location Requirements
Noise Considerations
•
Refer to
Trane Engineering Bulletins
for application information on RTAA
chillers.
•
Locate the outdoor unit away from sound-sensitive areas.
•
If required, install rubber vibration isolators in all water piping and use
flexible electrical conduit.
•
Refer to “Unit Isolation”.
•
Consult an acoustical engineer for critical applications.
Содержание RTAA-100
Страница 12: ...12 RTAA SVX01A EN Installation Mechanical Figure 4 RTAA Rigging and Lifting Weights Packaged Unit...
Страница 13: ...RTAA SVX01A EN 13 Installation Mechanical Figure 5 RTAA Rigging and Lifting Weights Remote Evaporator...
Страница 14: ...14 RTAA SVX01A EN Installation Mechanical Figure 6 RTAA Rigging and Lifting Weights Pump Package Aluminum Fins...
Страница 15: ...RTAA SVX01A EN 15 Installation Mechanical Figure 7 RTAA Rigging and Lifting Weights Pump Package Copper Fins...
Страница 18: ...18 RTAA SVX01A EN Installation Mechanical Figure 8 Dimensions and Clearances for RTAA Packaged Unit 70 125 Tons...
Страница 20: ...20 RTAA SVX01A EN Installation Mechanical Figure 10 Remote Evaporator Dimensions RTAA 70 125 Tons...
Страница 21: ...RTAA SVX01A EN 21 Installation Mechanical Figure 11 Remote Evaporator Dimensions RTAA 110 125 Tons...
Страница 25: ...RTAA SVX01A EN 25 Installation Mechanical Figure 14 Isolator Placement for RTAA with Remote Evaporator...
Страница 45: ...RTAA SVX01A EN 45 Installation Remote Evaporator Figure 24 Refrigerant Sensor Mounting and Wiring...
Страница 65: ...RTAA SVX01A EN 65 Installation Electrical Figure 31 Remote Display Panel Interconnecting Wiring...
Страница 110: ...110 RTAA SVX01A EN Start Up Procedures Figure 37 Unit Sequence of Operation...
Страница 143: ...RTAA SVX01A EN 143 Pump Package Figure 47 Pump Package Piping Schematic...
Страница 144: ...144 RTAA SVX01A EN Pump Package...
Страница 146: ...146 RTAA SVX01A EN 3327...
Страница 147: ...RTAA SVX01A EN 147...
Страница 148: ...148 RTAA SVX01A EN 3328...
Страница 149: ...RTAA SVX01A EN 149...
Страница 150: ...150 RTAA SVX01A EN 6516...
Страница 151: ...RTAA SVX01A EN 151...
Страница 152: ...152 RTAA SVX01A EN 3329...
Страница 153: ...RTAA SVX01A EN 153...
Страница 154: ...154 RTAA SVX01A EN 6472...
Страница 155: ...RTAA SVX01A EN 155...
Страница 156: ...RTAA SVX01A EN 156 3330...
Страница 157: ...157 RTAA SVX01A EN...
Страница 158: ...158 RTAA SVX01A EN 6046...
Страница 159: ...RTAA SVX01A EN 159...
Страница 160: ...160 RTAA SVX01A EN 3331...
Страница 161: ...RTAA SVX01A EN 161...
Страница 162: ...162 RTAA SVX01A EN 6519...
Страница 163: ...RTAA SVX01A EN 163...
Страница 164: ...164 RTAA SVX01A EN 6047...
Страница 165: ...RTAA SVX01A EN 165...
Страница 166: ...166 RTAA SVX01A EN 3325...
Страница 167: ...RTAA SVX01A EN 167...
Страница 168: ...168 RTAA SVX01A EN 6048...
Страница 169: ...RTAA SVX01A EN 169...
Страница 172: ...172 RTAA SVX01A EN 3326...
Страница 173: ...RTAA SVX01A EN 173...
Страница 174: ...174 RTAA SVX01A EN 6049...
Страница 175: ...RTAA SVX01A EN 175...
Страница 176: ...176 RTAA SVX01A EN 6463...
Страница 177: ......