109
TRAK Machine Tools
Southwestern Industries, Inc.
ProtoTRAK SMX, K2, K3 & K4 & Retrofit Safety, Installation, Maintenance, Service and Parts List Manual
6.0 Retrofit Installation
This section of the manual is intended to provide step-by-step instructions for installing a ProtoTRAK SMX 2 or 3-axis
control on a vertical knee milling machine. Within Sections 6, 7 and 8 it may refer to other sections of the manual for
certain procedures or figures.
6.1 Installation Tools and Hardware
The following section lists the required tools and hardware for installing a ProtoTRAK SM control. It also lists the pre-
installation requirements needed to complete the retrofit at the customers shop.
6.2 Required Tools/Hardware
The following tools are necessary for a typical installation:
*
Allen wrenches, set, inch and metric
*
Drill motor
*
Drills, set
*
Taps, set, and tap handle
*
Machinist square
*
Bubble level
*
Crescent wrench, 10”
*
Torque wrench, up to 60 ft/lbs.
*
Crowfoot wrench, 1 1/4” open end to fit torque wrench
*
Socket set with 3” and 6” extension and ratchet wrench
*
Dial calipers
*
Flat blade screwdriver set
*
Phillips screwdriver set
*
Standard or gauge blocks, 6”/150mm
*
Gauge block, 75mm or 3”
*
.0001” dial indicator and magnetic base
*
Center punch
*
Hammer, small
*
Combination wrenches, set, 3/8” to 15/16”
*
Counterbores or step drills set
*
Combination wrench, 10mm
*
Transfer punch set
*
Transfer screw set
*
Feeler gage (Z glass scales)
*
Pliers set
*
File set
*
Xacto knife with flat blade
*
3/4” 2 flute end mill
*
Safety glasses