
- 10 -
tousek
/ EN_ST-63_02 / 25. 03. 2020
2.4 Connection notes for the operator SWING X-TP
ST 63
CONNECTION OF OPERATORS to control unit
left operator
right operator
INSIDE
Connection wire with
the color / number
left operator
right operator
MODBUS → FU-L
MODBUS → FU-R
(M)
motor wire
1
→
frequency converter
U/T1
frequency converter
U/T1
2
→
V/T2
V/T2
3
→
W/T3
W/T3
green/yellow →
grounding screw
grounding screw
shield
→
grounding plate
grounding plate
(S)
sensor wire
1
→
terminal KL2: 65
terminal KL2: 65
2
→
terminal KL2: 66
terminal KL2: 67
3
→
terminal KL2: 68
terminal KL2: 68
if shield used
→
Important: motor and sensor wires
•
Attention: Before carrying out any connection works, the power supply of the gate facility has to be turned off!
• It is possible to connect 2 SWING X-TP motors to the control unit ST63. The operator SWING X-TP has a connection
cable for the power supply and for the integrated torque sensor. The sensor signal is sent to the control unit and defines
the performance/response when hitting an obstacle or when reaching a gate end position.
• The motor and sensor wires must be supplied to the control unit in 2 separate tubes
or a cable channel with partition.
•
1
1K
The ST63 control unit for 1 leaf operation is prewired in the factory for right leaf. For left leaf operation the
MODBUS must be connected to the FU-L slot. The sensor wires must be connected for the left operator according to
the chart below.
sensor wires connection to the terminal block (KL2)
• The sensor wire must not exceed the
max. length of 50m !
- For lengths of more than 20m shielded con-
trol lines must always be used.
The shield must be clamped together with the cable number 3 (terminal 68).
• If sensor wires with more than 3 cables are used the remaining cables must be clamped together with the
cable num-
ber 3 (terminal 68) - do not clamp to a ground wire (earth lead)!
•
When connecting the sensors to the control unit please note the labeling/marking of the cables (number 1–3).
Bad connection leads to destruction !
motor wires
• The motor wire (3 wires marked with 1, 2, 3
and the ground wire) must be connected to the frequency converter. If 2 ope
-
rators going to be connected each operator must be connected to one frequency converter (FU-1, FU-2). The frequency
converter (FU) of the
left operator
must be connected to the
FU-L
MODBUS slot of the control board. The frequency
converter (FU) of the
right operator
must be connected to the
FU-R
MODBUS slot of the control board.
•
IMPORTANT:
After switching on the power supply and giving an impulse (command) the gate leaves must
open!
If it is not the case, 2 of the 3 phases (1, 2, 3
) connected to the frequency converter must be interchanged.
2
3
1
green/yellow
1
2
3
1
2
3
2
3
1
operators SWING X TP
M
IMPORTENT!
separate tubes or a
cable channel with partition!
shield
S
3
2
1
grounding screw
1 2 3
M
MODBUS
(FU-connection → FU-L or FU-R)
shield
grounding plate