7. Putting Relay into Service
The following procedure must be adhered to when putting the relay into service after finishing
commissioning or maintenance tests.
•
Check that all external connections are correct.
•
Check the settings of all measuring elements, timers, scheme switches, recordings and clock
are correct.
In particular, when settings are changed temporarily for testing, be sure to restore them.
•
Clear any unnecessary records on faults, events and disturbances which are recorded during
the tests.
•
Reset the counter figures of autoreclose(*), if necessary. For resetting the count, see Section
4.2.3.4.
(*)
Implemented in models 200s to 500s.
•
Press the VIEW
key and check that no failure message is displayed on the
"Auto-supervision" screen.
•
Check that the green "IN SERVICE" LED is lit and no other LEDs are lit on the front panel.
Whilst the relay is put into service at one terminal by supplying DC power and not yet at the
other terminal, a communication failure will be detected by the automatic monitoring at the
in-service terminal and a red "ALARM" LED is lit. But it will be reset when the relays are put
into service at all terminals.
Содержание GRL100-101A
Страница 8: ... 7 6 F 2 S 0 8 3 5 6 7 4 Resumption of Service 220 6 7 5 Storage 220 7 Putting Relay into Service 221 ...
Страница 223: ... 222 6 F 2 S 0 8 3 5 ...
Страница 228: ... 227 6 F 2 S 0 8 3 5 Appendix B Signal List ...
Страница 256: ... 255 6 F 2 S 0 8 3 5 Appendix C Variable Timer List ...
Страница 258: ... 257 6 F 2 S 0 8 3 5 Appendix D Binary Output Default Setting List ...
Страница 269: ... 268 6 F 2 S 0 8 3 5 ...
Страница 270: ... 269 6 F 2 S 0 8 3 5 Appendix E Details of Relay Menu ...
Страница 279: ... 278 6 F 2 S 0 8 3 5 ...
Страница 288: ... 287 6 F 2 S 0 8 3 5 Appendix G Typical External Connection ...
Страница 326: ... 325 6 F 2 S 0 8 3 5 Appendix J Return Repair Form ...
Страница 330: ... 329 6 F 2 S 0 8 3 5 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Страница 331: ... 330 6 F 2 S 0 8 3 5 ...
Страница 332: ... 331 6 F 2 S 0 8 3 5 Appendix K Technical Data ...
Страница 343: ... 342 6 F 2 S 0 8 3 5 ...
Страница 344: ... 343 6 F 2 S 0 8 3 5 Appendix L Symbols Used in Scheme Logic ...
Страница 347: ... 346 6 F 2 S 0 8 3 5 ...
Страница 348: ... 347 6 F 2 S 0 8 3 5 Appendix M Multi phase Autoreclose ...
Страница 351: ... 350 6 F 2 S 0 8 3 5 ...
Страница 352: ... 351 6 F 2 S 0 8 3 5 Appendix N Data Transmission Format ...
Страница 358: ... 357 6 F 2 S 0 8 3 5 Appendix O Example of DIF and DIFG Setting ...
Страница 360: ... 359 6 F 2 S 0 8 3 5 Appendix P Programmable Reset Characteristics and Implementation of Thermal Model to IEC60255 8 ...
Страница 364: ... 363 6 F 2 S 0 8 3 5 Appendix Q IEC60870 5 103 Interoperability ...
Страница 377: ... 376 6 F 2 S 0 8 3 5 ...
Страница 378: ... 377 6 F 2 S 0 8 3 5 Appendix R Failed Module Tracing and Replacement ...
Страница 384: ... 383 6 F 2 S 0 8 3 5 Appendix S PLC Setting Sample ...
Страница 386: ... 385 6 F 2 S 0 8 3 5 Appendix T Ordering ...
Страница 392: ......