6. Commissioning and Maintenance
6.1 Outline of Commissioning Tests
The GRL100 is fully numerical and the hardware is continuously monitored.
Commissioning tests can be kept to a minimum and need only include hardware tests and
conjunctive tests. The function tests are at the user’s discretion.
In these tests, user interfaces on the front panel of the relay or local PC can be fully applied.
Test personnel must be familiar with general relay testing practices and safety precautions to
avoid personal injuries or equipment damage.
Hardware tests
These tests are performed for the following hardware to ensure that there is no hardware defect.
Defects of hardware circuits other than the following can be detected by monitoring which
circuits functions when the DC power is supplied.
User interfaces
Binary input circuits and output circuits
AC input circuits
Function tests
These tests are performed for the following functions that are fully software-based. Tests of the
protection schemes and fault locator require a dynamic test set.
Measuring elements
Timers
Protection schemes
Autoreclose
Metering and recording
Fault locator
Conjunctive tests
The tests are performed after the relay is connected with the primary equipment,
telecommunication equipment and other external equipment.
The following tests are included in these tests:
On load test: phase sequence check and polarity check
Signaling circuit test
Tripping and reclosing circuit test
Содержание GRL100-101A
Страница 8: ... 7 6 F 2 S 0 8 3 5 6 7 4 Resumption of Service 220 6 7 5 Storage 220 7 Putting Relay into Service 221 ...
Страница 223: ... 222 6 F 2 S 0 8 3 5 ...
Страница 228: ... 227 6 F 2 S 0 8 3 5 Appendix B Signal List ...
Страница 256: ... 255 6 F 2 S 0 8 3 5 Appendix C Variable Timer List ...
Страница 258: ... 257 6 F 2 S 0 8 3 5 Appendix D Binary Output Default Setting List ...
Страница 269: ... 268 6 F 2 S 0 8 3 5 ...
Страница 270: ... 269 6 F 2 S 0 8 3 5 Appendix E Details of Relay Menu ...
Страница 279: ... 278 6 F 2 S 0 8 3 5 ...
Страница 288: ... 287 6 F 2 S 0 8 3 5 Appendix G Typical External Connection ...
Страница 326: ... 325 6 F 2 S 0 8 3 5 Appendix J Return Repair Form ...
Страница 330: ... 329 6 F 2 S 0 8 3 5 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Страница 331: ... 330 6 F 2 S 0 8 3 5 ...
Страница 332: ... 331 6 F 2 S 0 8 3 5 Appendix K Technical Data ...
Страница 343: ... 342 6 F 2 S 0 8 3 5 ...
Страница 344: ... 343 6 F 2 S 0 8 3 5 Appendix L Symbols Used in Scheme Logic ...
Страница 347: ... 346 6 F 2 S 0 8 3 5 ...
Страница 348: ... 347 6 F 2 S 0 8 3 5 Appendix M Multi phase Autoreclose ...
Страница 351: ... 350 6 F 2 S 0 8 3 5 ...
Страница 352: ... 351 6 F 2 S 0 8 3 5 Appendix N Data Transmission Format ...
Страница 358: ... 357 6 F 2 S 0 8 3 5 Appendix O Example of DIF and DIFG Setting ...
Страница 360: ... 359 6 F 2 S 0 8 3 5 Appendix P Programmable Reset Characteristics and Implementation of Thermal Model to IEC60255 8 ...
Страница 364: ... 363 6 F 2 S 0 8 3 5 Appendix Q IEC60870 5 103 Interoperability ...
Страница 377: ... 376 6 F 2 S 0 8 3 5 ...
Страница 378: ... 377 6 F 2 S 0 8 3 5 Appendix R Failed Module Tracing and Replacement ...
Страница 384: ... 383 6 F 2 S 0 8 3 5 Appendix S PLC Setting Sample ...
Страница 386: ... 385 6 F 2 S 0 8 3 5 Appendix T Ordering ...
Страница 392: ......