
5
Installing the Data Plate
For Machines Operated In Germany
Parts needed for this procedure:
1
Data plate
4
Rivet (5 x 10 mm)
Procedure
1.
At the forward end of the right platform channel,
measure 51 mm (2 inches) rearward and mark the
channel (
Figure 17
2.
Align the data plate to the platform channel as shown
in
and mark the 4 hole locations.
3.
Centerpunch the platform channel at the 4 marks
(
).
4.
Drill 4 holes 3 mm (1/8 inch) through the channel at
the centerpunch marks (
).
5.
Rivet the data plate to the platform channel (
).
Figure 18
1.
Data plate
3.
Right platform channel
2.
Rivet
6
Installing the Turn-Signal
Switch
Parts needed for this procedure:
1
Turn-signal switch
1
Hose clamp
Procedure
1.
Align the turn-signal switch with the steering-wheel
valve.
Note:
The orientation of the turn-signal switch will
vary if the foam marker is installed.
2.
Place the hose clamp over the steering-wheel valve,
and insert the hose clamp through the opening on the
turn-signal switch (
3.
Secure the turn-signal switch to the steering column
with the hose clamp (
10