3-6
3
Chain Removal
DRIVE CHAIN 3.3
1
Remove any attachment, raise the boom arms and
engage the boom support pins. Shut off the engine.
2
Block the loader securely with all 4 wheels clear of
the ground.
3
Remove the wheels from the side of the loader the
chain is to be removed.
4
Clean the excess dirt from the final drive housing
drain plug area and the inspection cover area located
between the 2 axle towers. (fig. C168)
5
Remove the lower drain plug and drain the oil. Refer
to Section 3.2 page 3-3.
6
Remove the final drive inspection cover. (fig. C168)
7
Rotate the chain, if necessary, to locate the master
connecting link by starting the engine and engaging the
steering control. Be sure the loader is securely raised
clear of the ground.
7
Loosen the 3 chain tightener nuts. Refer to Adjusting
the drive Chain page 3-5.
8
Loosen the adjuster nuts and allow the tightener to
fully release the tension on the chain. (All the way back
in the adjustment slots).
C168
C169
Remove the connector link
Remove the chain
C2273
C2271
9
Remove the cotter pins from the master connecting
link and remove the connecting link. (fig. C2271) The
connecting link is a press fit type and will need to be sup-
ported as you drive the link pins through the link plate.
10 Remove the chain from the housing by turning the
axles by hand and pulling the slack chain out the inspec-
tion cover area. (fig. C2273) Hold the chain up off the
drive sprocket to allow the chain to rotate freely.
Содержание 1300 ProTough
Страница 1: ...REPAIR MANUAL 135 137 153 1300 ProTough Publication No 49702 September 2004 THOMAS...
Страница 13: ...1 HYDRAULIC SCHEMATIC 1 1 1 3 C4475...
Страница 61: ...1 1 51 NOTES...
Страница 86: ...2 25 2 TANDEM PUMP PARTS DIAGRAM 2 11 C 2875 6 1 5 5 2 7 8 10 11 12 13 4 4 4 4 3 3 9 2 LN000500 onward shown...