Index
'JOOJHBO-52
_____________________________________________________________________________
_______________________ Finnigan LTQ Hardware Manual _______________________
VII
5IFSNP
&-&$530/$03103"5*0/
electron multiplier, 7-12
ESI probe, 7-3
fans, 7-18
fittings, 7-21
Ion Max, 7-3
manuals, 7-18
mass analyzer, 7-12
metal needle kits, 7-21
MS detector, 7-2
O-rings, 7-13
PCBs, 7-16
power supplies, 7-16
sample loops, 7-21
syringe pump, 7-12
turbomolecular pump, 7-12
vent valve, 7-16
replacement procedures
anode, electron multiplier, 4-39
electron multiplier, 4-39
fuses, 6-4
ion transfer capillary, 4-11
power supplies, 6-5
sample tube, APCI, 4-10
reset button
location (figure), 5-2
LTQ reset, 5-9
resonance ejection RF voltage
description, 2-19
resonance excitation RF voltage
description, 2-18
RF voltages
ion isolation waveform, 2-18
resonance ejection RF voltage, 2-19
resonance voltage, 2-18
storage voltage, 2-18
rod assemblies
functional description, 2-16, 2-17
rotary-vane pump
oil, purging, 3-11
S
safety precautions, 1-xvi
sample loop
replaceable parts, 7-21
sample transfer line
flushing, 3-6, 4-7
sample tube
APCI, replacing, 4-10
flushing, 3-6, 4-7
sample tube, repositioning (note), 3-3
scan
defined, 1-2
scan data types
centroid scan, 1-18
profile scan, 1-18
Scan LED
description, 2-8
scan modes
consecutive reaction monitoring (CRM), 1-16
scan power
defined, 1-13
scan types
defined, 1-14
full scan, 1-14
selected ion monitoring (SIM), 1-15
selected reaction monitoring (SRM), 1-16
single-stage full scan, 1-14
two-stage full scan, 1-15
ZoomScan, 1-17
section, 2-16, 2-17
selected ion monitoring (SIM)
defined, 1-15
selected reaction monitoring (SRM)
defined, 1-16
service switch
description, 2-9
sheath gas
flow rates, ESI, 2-31
on/off status (table), 5-14
pressure, 2-31
sheath gas valve
description, 2-31
shutdown
complete shutdown, 5-4
data system, 5-5
emergency procedure, 5-2
emergency, main power circuit breaker, 2-9
MS detector, 5-4
skimmer
cleaning, 4-13
description, 2-13
solvents
cleaning, 4-14
disposal (CAUTION), 4-5
MS detector maintenance, 4-5
purity requirements, 1-xviii
spray cone
location (figure), 3-10, 4-16
standby condition
MS detector components on/off status, 5-14
placing system in, 5-3
startup
autosampler, 5-7
data system, 5-6
liquid chromatograph, 5-6
LTQ system, 5-6
MS detector, 5-6
operating conditions, setting, 5-8
supplies
MS detector maintenance, 4-5
Sweep, 3-10
sweep, 3-11
sweep gas supply port (figure), 3-10
syringe pump
description, 2-5
location (figure), 2-5
replaceable parts, 7-12
start/stop button, location (figure), 2-5
Syringe Pump dialog box, 2-5
syringe pump LED
description, 2-5
location (figure), 2-5