![Thermo Finnigan LTQ Скачать руководство пользователя страница 159](http://html.mh-extra.com/html/thermo/finnigan-ltq/finnigan-ltq_hardware-manual_1104223159.webp)
System Shutdown, Startup, and Reset
'JOOJHBO-52
_____________________________________Starting Up the System after a Complete Shutdown
_______________________ Finnigan LTQ Hardware Manual ______________________
5-7
5IFSNP
&-&$530/$03103"5*0/
4. Place the main power circuit breaker switch in the On (|) position. When
you place the main power circuit breaker switch in the On (|) position, the
rotary-vane pump and the turbomolecular pump are started. All LEDs on
the MS detector front panel are off.
5. Allow the LTQ to pump down for 5 min.
6. Place the electronics service switch in the Electronics Normal position.
When you place the electronics service switch in the Electronics Normal
position, the following occurs:
•
The Power LED on the MS detector front panel is illuminated green
to indicate that power is provided to the MS detector electronics. (The
electron multiplier, conversion dynode, 8 kV power to the API
source, main RF voltage, and octapole RF voltage remain off.)
•
The embedded computer reboots. After several seconds the
Communication LED on the front panel is illuminated yellow to
indicate that the data system and the MS detector have started to
establish a communication link.
•
After several more seconds, the Communication LED is illuminated
green to indicate that the data system and the MS detector have
established a communication link. Ensure that the instrument console
window is active. Software for the operation of the MS detector is
then transferred from the data system to the MS detector.
•
After 3 minutes, the System LED is illuminated yellow to indicate
that the software transfer from the data system to the MS detector is
complete and that the instrument is in Standby.
If you have an autosampler, go on to the next topic: Starting Up the
Autosampler. If you do not have an autosampler, go to the topic: Setting Up
Conditions for Operation.
Starting Up the Autosampler
To start up the autosampler, place the main power switch on the autosampler
in the on position. If necessary, configure the autosampler. For procedures for
placing sample vials, preparing solvent and waste bottles, installing syringes,
etc., refer to the manual that came with the autosampler. Refer also to LTQ
Getting Connected.
Note. The Vacuum LED on the front panel of the MS detector is illuminated
green only if the pressure in the vacuum manifold is below the maximum
allowable pressure (5
×
10
-4
Torr in the analyzer region, and 2 Torr in the
capillary-skimmer region), and the safety interlock switch on the API source
is depressed (that is, the API flange is secured to the spray shield).