![Thermo Finnigan LTQ Скачать руководство пользователя страница 155](http://html.mh-extra.com/html/thermo/finnigan-ltq/finnigan-ltq_hardware-manual_1104223155.webp)
System Shutdown, Startup, and Reset
'JOOJHBO-52
_____________________________________________ Placing the System in Standby Condition
_______________________ Finnigan LTQ Hardware Manual ______________________
5-3
5IFSNP
&-&$530/$03103"5*0/
5.2 Placing the System in Standby
Condition
The LTQ system does not need to be shut down completely if you are not
going to use it for a short period of time, such as overnight or over weekends.
When you are not going to operate the system for 12 hours or more, you can
leave the system in a standby condition.
Use the following procedure to place the LTQ system in the standby
condition:
1. Wait until data acquisition, if any, is complete.
2. Turn off the flow of sample solution from the LC to the API source, as
follows:
a.
In the Tune Plus window, click on the LC button. The Inlet Direct
Control dialog box appears.
b. Click on
(or
Pump Off
or
Stop Pump)
to stop the LC pump.
3. From the Tune Plus window, choose
Control > Standby
(or click on the
On/Standby button to toggle it to Standby) to put the MS detector in
Standby
.
When you choose Control > Standby, the LTQ turns off the
electron multipliers, conversion dynodes, 8 kV power to the API source,
main RF voltage, and ion guide RF voltages. LTQ also turns off the
auxiliary and sheath gas flows. See Table 5-1 on page 5-14 for the On/Off
status of MS detector components when the MS detector is in the standby
condition. The System LED on the front panel of the MS detector is
illuminated yellow when the system is in Standby.
4. Flush the spray shield and the entrance end of the ion transfer capillary of
the API source as describe in the topic Flushing the Spray Shield and
Ion Transfer Capillary in the MS Detector Maintenance chapter. Cap
the ion transfer capillary with the septum. Leave the API flange
withdrawn from the spray shield.
5. Purge the rotary-vane pump oil as described in the topic Purging the
Rotary-Vane Pump Oil in the MS Detector Maintenance chapter.
6. Leave the MS detector power on.
7. Leave the LC power on.
8. Leave the autosampler power on.
9. Leave the data system power on.
Caution. If you are using APPI: Do not leave the LC or other liquid
delivery device on while the mass spectrometer is in Standby. The absence
of sheath and auxiliary gas can cause the hot VUV lamp to break upon
contact with liquids.
On Standby