UltiMate 3000 Series:
NCS-3500RS and NCP-3200RS
Page
82
Operating Instructions
4.6.3 Installing a Trap Column
Certain applications, for example, preconcentration, require the installation of a trap
column. The trap column is connected directly to the column switching valve.
When installing the trap column, observe the direction of flow (indicated by an arrow on the
column). Connect the column to the valve in the direction of the nano flow. More information
about how to connect the column is shipped with the column. In addition, observe the general
information about how to connect capillaries (
→
page 57).
4.6.4 Connecting the Components to the Column Switching Valve
1.
Do not touch any metal or plastic parts inside the column chamber while the
temperature is higher than 50 °C. Before carrying out any work in the column
compartment, wait for the column chamber to cool down.
To shorten the cool-down time, consider setting a lower temperature and opening the
front panel door.
2.
A plastic cap protects the valve ports during shipment. Remove the plastic cap if it is
still present.
3.
Connect the capillaries to the column switching valve as required by your application.
When connecting the capillaries, observe the general information about how to
connect and route the capillaries (
→
Содержание Dionex UltiMate 3000 Series
Страница 2: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Operating Instructions ...
Страница 8: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Page vi Operating Instructions ...
Страница 24: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Page 16 Operating Instructions ...
Страница 62: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Page 54 Operating Instructions ...
Страница 92: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Page 84 Operating Instructions ...
Страница 246: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Page 238 Operating Instructions ...
Страница 262: ...UltiMate 3000 Series NCS 3500RS and NCP 3200RS Page 254 Operating Instructions ...